From: Gerald Fisher

Sent: Tue Jun 29 08:42:36 2021

To: Bobby Wintrode

Cc: Dan Zinder; Sam Miller; Mac Corthell

Subject: RE: 200 Hezzie Ln

Importance: Normal

Attachments: image001.jpg;

 

AKS has done good work here. Any engineering company that has all of the needed parts of your project will work. Stormwater/drainage, surveying, etc.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Mac Corthell <mcorthell@cityofmolalla.com>

Sent: Tuesday, June 29, 2021 7:33 AM

To: Bobby Wintrode <bobby@surgeline.com>

Cc: Gerald Fisher <gfisher@cityofmolalla.com>; Dan Zinder <dzinder@cityofmolalla.com>; Sam Miller <smiller@cityofmolalla.com>

Subject: RE: 200 Hezzie Ln

Hi Bobby,

Gerald and Sam work with the Engineers a lot more than I do, so I’ll let them fill you in on this. We can’t make a recommendation, but I Know we’ve worked well with AKS in the past and have seen good work from ARD recently. I hope this helps, and maybe the others have another idea for you.

-Mac

Macahan “Mac” Corthell, J.D. | Planning Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Phone - 503.829.6855

Fax – 503.829.3676

Email – mcorthell@cityofmolalla.com

Website – http://www.cityofmolalla.com

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Bobby Wintrode <bobby@surgeline.com>

Sent: Tuesday, June 29, 2021 7:29 AM

To: Mac Corthell <mcorthell@cityofmolalla.com>

Cc: Gerald Fisher <gfisher@cityofmolalla.com>; Dan Zinder <dzinder@cityofmolalla.com>; Julie Larson <jlarson@cityofmolalla.com>

Subject: Re: 200 Hezzie Ln

Do you have a referral or recommendation for an engineer that I can reach out to regarding this type of project?

 

Thanks-

Bobby Wintrode

General Manager

Ph: 503.670.9500

Fax: 503.296.2428

bobby@surgeline.com

www.surgeline.com

image

On Mon, Jun 21, 2021 at 11:43 AM Mac Corthell <mcorthell@cityofmolalla.com> wrote:

Hi Mr. Winterode,

I tried calling your phone several times but it remained silent then disconnected me each time. However, I was able to chat with Gerald Fisher, Public Works Director, upon his return this morning and have the input I needed to help guide your process.

  1. 1. Each neighbor will need to file for an individual grading permit (it’s the same permit for excavation, fills, and grades). The applications will need to include an engineered design to get drainage from one side to the other, similar to the drawing you provided, but fully evolved and stamped by an engineer. Each owner can submit the same drawing as it will run across all four properties… so you may want to speak to your neighbors about splitting the cost of engineering. The fill permit is an “other type 1” form available on the city’s forms page here: https://www.cityofmolalla.com/forms, under Planning Forms.

 

  1. 2. Once the city has reviewed and approved the grading permits you’ll need to take the approvals to the County and pull the appropriate permits from the County Building Codes Division. They will ultimately test the compaction of your fill to ensure it meets required standards. Upon completion, a condition of approval will be for you to provide the County approvals of the fill and compaction to the City for your file.

 

  1. 3. As an aside, continue working with DSL. We’ll need their approval in order to approve your grading/fill permit from item #1 above.

 

Let me know if you have any more questions, sorry for the phone tag.

-Mac

Macahan “Mac” Corthell, J.D. | Planning Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Phone - 503.829.6855

Fax – 503.829.3676

Email – mcorthell@cityofmolalla.com

Website – http://www.cityofmolalla.com

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.