From: Mac Corthell

Sent: Tue Jun 29 15:45:09 2021

To: Dan Zinder; Gerald Fisher; Robinson, Michael C.; Stephenson, Garrett H.; Mike Rogers

Subject: Updated Condition - Scandia - Molalla

Importance: Normal

 

Hello All,

Thank you for your time this afternoon. Please review the ‘Redraft’ condition below and provide any feedback and/or proposed language you may have. Please respond to me individually without the group if you have comments.

Original:

Applicant will be required to design and construct a new 8-inch waterline extension from the stubbed waterline near the northeast corner of the building. The waterline shall extend south around the east side of the building and south along the old Wittenberg roadway alignment to the south end of 535 W Main and end and reconnect to the existing waterline.

Redraft:

Applicant will be required to design and construct a new 8” waterline extending from the stubbed waterline near the northeast corner of 535 W Main St., bearing roughly southward along the abandoned Wittenberg roadway alignment, around the east side of the building on site, to the southeast corner of 535 W Main St., and reconnecting to the waterline at approximately that location.

A 6” waterline currently runs from approximately the southeast corner of property known as Map 52E08A Tax lot 07800 (535 W Main St). The line extends northward from that point across the property at 535 W Main St. The City will provide the applicant a credit for the existing 6” waterline that will accrue and be payable upon completion and acceptance of the required 8” waterline installation. Applicant will be required to provide linear footage of the 6” waterline existing on 535 W Main St. and allow City Officials access to inspect the waterline in order to confirm linear footage.

The City will extend an 8” waterline northward from W Main St., along the abandoned Wittenberg roadway alignment to the southeast corner of the property known as Map 52E08A Tax lot 07800 (535 W Main St). Applicant will be required to connect the required 8” waterline on 535 W Main St., to the newly extended 8” waterline referenced in this paragraph.

The City will entertain a development agreement, modification, or any other appropriate, legally binding instrument to give effect to this condition and the obligations of each party. However, unless a modification is approved and modifies the timing of this condition: prior to City Approval of Occupancy and within the lifecycle of this (SDR02-2021) approval (1-year with an option for 1 year extension upon application and approval) the applicant shall design and construct, or cause to be designed and constructed, a new 8” waterline extending from the stubbed waterline near the northeast corner of 535 W Main St., bearing roughly southward along the abandoned Wittenberg roadway alignment, around the east side of the building on site, to the southeast corner of 535 W Main St., and reconnecting to the waterline at approximately that location.

Macahan “Mac” Corthell, J.D. | Planning Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Phone - 503.829.6855

Fax – 503.829.3676

Email – mcorthell@cityofmolalla.com

Website – http://www.cityofmolalla.com

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.