From: Gerald Fisher

Sent: Tue Feb 02 11:46:58 2021

To: Ryan Quigley

Cc: Mac Corthell (Molalla); Dan Zinder

Subject: FW: River Meadows at the horn

Importance: Normal

Attachments: image001.jpg; C1.pdf; C2.pdf; C3.pdf;

 

Hi Ryan,

We’ve had a request for you to prepare a scope of work for a Certificate of Capacity for the attached project. Assume that the total number of lots is 30 and prepare it only for one SF home per lot. Thanks.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Dan Symons <dans@symonsengineering.com>

Sent: Friday, January 29, 2021 4:09 PM

To: Gerald Fisher <gfisher@cityofmolalla.com>

Cc: D. Carter <dahacar@gmail.com>; Mac Corthell <mcorthell@cityofmolalla.com>; Dan Zinder <dzinder@cityofmolalla.com>

Subject: RE: River Meadows at the horn

Thanks Gerald:

Attached are the plans from the previous Zoning Checklist, no changes since that point in time. I believe Mr. Carter would like to proceed with Prelim Plat/Site Design Review immediately with engineering plans following in close pursuit.

Dan Symons

Symons Engineering Consultants, Inc.

phone: 503 760 1353

www.symonsengineering.com

Integrity & Strength in Design

image

From: Gerald Fisher <gfisher@cityofmolalla.com>

Sent: Friday, January 29, 2021 12:12 PM

To: Dan Symons <dans@symonsengineering.com>

Cc: D. Carter <dahacar@gmail.com>; Mac Corthell <mcorthell@cityofmolalla.com>; Dan Zinder <dzinder@cityofmolalla.com>

Subject: RE: River Meadows at the horn

Hi Dan,

Once I have the development layout and can provide that to our consultant, I will ask them to prepare a scope of work. I will send you a copy of the scope and once we have a check for work then I will issue them a notice to proceed. They will provide us with their report and we will share that with you prior to DEQ. If everything looks good to you then you can email me with an approval to submit to our DEQ representative. They may require a review fee so I will include you in my email to them. Once DEQ approves then they will send us an official notice and that takes care of any DEQ barriers to the City proceeding. After Planning Commission approval of a project, we can’t take in engineering plans until we receive DEQ approvals of the Certificate of Capacity, though the timing of that so far has not been an issue. Hopes this information helps. Thanks and have a good weekend.

Regards,

Gerald Fisher, P.E. | Public Works Director

City of Molalla

117 N Molalla Ave. | PO Box 248 |Molalla, OR 97038

Office: 503.829.6855 | Direct: 503.759.0218

CONFIDENTIALITY NOTICE: The information contained in this email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient and have received this communication in error, please contact the sender by reply email and destroy all copies of the original message. Thank you.

From: Dan Symons <dans@symonsengineering.com>

Sent: Friday, January 29, 2021 11:00 AM

To: Mac Corthell <mcorthell@cityofmolalla.com>; Dan Zinder <dzinder@cityofmolalla.com>; Gerald Fisher <gfisher@cityofmolalla.com>

Cc: D. Carter <dahacar@gmail.com>

Subject: River Meadows at the horn

Mr. Corthell, Mr. Zinder, and Mr. Fisher:

Thanks to all of you for the near heroic efforts to get the administrative annexation process processed by City Council Wednesday evening. Even though development specific details weren’t officially on the table at this stage we were present and we listened.

Since the ordinance was adopted I am assuming we are clear to move forward with a Preliminary Subdivision application, do you need another Zoning Checklist for this Type III application?

I am trying to dial down through the LU Application Checklist and confirm everything we’ll need to be deemed complete:

Is there anything I’ve overlooked?

At the pre-app in June it was stated that a Neighborhood Meeting wasn’t required but recommended. Given the level of concerned testimony I agree that we should try to have a NH Meeting sometime after being deemed complete but before a Staff Report is finalized. Is that proper timing?

Thanks again for your assistance.

Dan Symons

Symons Engineering Consultants, Inc.

phone: 503 760 1353

www.symonsengineering.com

Integrity & Strength in Design

image