From: Dan Symons

Sent: Tue Jun 23 16:52:02 2020

To: Dan Zinder

Cc: Gerald Fisher; Larry Shirts

Subject: RE: Storm info for Lexington Estates

Importance: Normal

Attachments: image002.jpg; image003.png;

 

Thanks again Dan, I purged our archive files a few years ago so I appreciate you forwarding this. We are going to try to put together a better prelim plan for discussions with Alice on the 2nd and we have a couple of questions:

  1. 1. Was the storm line in Eric Drive and Anne Lane sized for the “horn” to tie in? On the surface it looks like it might be OK but I’d like to confirm. If you have Favreau’s stormwater calcs to forward I can look it up in there. Eventually we will probably calc it out ourselves but of course I’m looking for the easy button for this prelim design phase.
  2. 2. We looked at the Public Works Standards and didn’t find much reference to the minimum/maximum block length requirements, can you steer us to the proper location/document for that info?

 

Great to meet you as well, we are looking forward to working with all of you.

Dan Symons

Symons Engineering Consultants, Inc.

phone: 503 760 1353

www.symonsengineering.com

Integrity & Strength in Design

image

From: Dan Zinder <dzinder@cityofmolalla.com>

Sent: Friday, June 19, 2020 4:43 PM

To: Dan Symons <dans@symonsengineering.com>

Cc: D. Carter <dahacar@gmail.com>

Subject: Storm info for Lexington Estates

Dan and Dave,

Great to meet with you yesterday. I’ve snipped in a clip of our storm system south of the “horn” property below. All roads flow to the detention pond on the west side of the subdivision. Attached is the storm page for the northeast portion of Lexington Estates.

Have a great weekend.

image

Dan Zinder

Associate Planner, City of Molalla

117 N Molalla Ave | PO Box 248

Direct: 503.759.0226 | Office: 503.829.6855