From: Steve Smelser

Sent: Thu Oct 28 14:21:37 2021

To: Sam Miller

Subject: Re: 150 Miller St., Molalla

Importance: Normal

 

Hi Sam, Wednesday November 10th at 11:00 AM works great. Participants would be the City, Myself, Roy Bonner (Jim Smith Excavating), and Bruce Goldson (Theta Engineering).

Steve Smelser - 503-803-4068 srsmelser@gmail.com

Roy Bonner - 503-557-7470 roy@jimsmithexcavating.com

Bruce Goldson - 503-481-8822 thetaeng@comcast.net

 

Thank

 

On Thu, Oct 28, 2021 at 2:07 PM Sam Miller <smiller@cityofmolalla.com> wrote:

 

Good Afternoon Steve,

Wednesday, November 10th at 11AM work best for me. I will send out an meeting invite, is their anyone in particular you want me to include and you will need to provide an extra full size plan set for City stamp that will be required to be on site.

Regards,

Sam Miller | Sr. Engineer Tech.

City of Molalla

117 N Molalla Ave. | PO Box 248 | Molalla, OR 97038

T : 503-759-0217 | E: smiller@cityofmolalla.com

From: Steve Smelser <srsmelser@gmail.com>

Sent: Thursday, October 28, 2021 1:24 PM

To: Sam Miller <smiller@cityofmolalla.com>

Subject: 150 Miller St., Molalla

Hi Sam, I was wondering if we could set up a pre construction meeting for the Miller Street project for Tuesday, November 9th or Wednesday, November 10th at 10AM or 11AM.

At that meeting, we will have

1. 1 full size plan set & 1 half size plan set for the city.

2. Insurance certification.

3. Private Performance Bond or a check for $27,047.50.

4. a check for the permit fee allocation.

We look forward to meeting at the pre construction conference.

Thank you,

image "https://drive.google.com/uc?id=1p3_Fo0bHJsb83nDsjo7wq5EuHrpLcyLx&export=download"

 

 

--

 

image"https://drive.google.com/uc?id=1p3_Fo0bHJsb83nDsjo7wq5EuHrpLcyLx&export=download"