From: Steve Smelser

Sent: Thu Oct 28 13:24:25 2021

To: Sam Miller

Subject: 150 Miller St., Molalla

Importance: Normal

 

Hi Sam, I was wondering if we could set up a pre construction meeting for the Miller Street project for Tuesday, November 9th or Wednesday, November 10th at 10AM or 11AM.

At that meeting, we will have

1. 1 full size plan set & 1 half size plan set for the city.

2. Insurance certification.

3. Private Performance Bond or a check for $27,047.50.

4. a check for the permit fee allocation.

We look forward to meeting at the pre construction conference.

Thank you,

 

image"https://drive.google.com/uc?id=1p3_Fo0bHJsb83nDsjo7wq5EuHrpLcyLx&export=download"