http://www.deq.state.or.us/wq/wqpermit/permits.htm
Water Quality Permit Program Forms | Frequently Asked Questions | Permit Documents | Tools and Data | Program Topics | Wastewater Permitting | Resources Current News Current Water Quality Permit Fees The Environmental Quality Commission adopted a proposed fee increase for water quality permits at the December 2015 commission meeting. The updated fees are effective Jan. 1, 2016 and apply to the following types of permits: Individual and General NPDES and WPCF Permits: Onsite Septic System Permits: Note: If you have viewed the above files prior to Jan. 1, you may need to refresh your web browser to view the newest PDF file. DEQ Issues New Underground Injection Control General Permit DEQ’s Underground Injection Control Program has released a new general permit for stormwater underground injection control systems that own or operate less than 50 UICs. A “UIC” is typically a device that injects fluids (in this case stormwater) into the ground. This type of stormwater disposal system is also known as a drywell. DEQ regulates stormwater UICs to ensure that drinking water is protected from pollutants in stormwater. Current UIC system operators covered under an individual UIC permit may be eligible for the general permit. Visit the UIC program page for more information.
|
http://www.deq.state.or.us/wq/wqpermit/genpermits.htm
General Permits | |||||
Permit | Description | Type | Documents and Information | ||
100-J | Cooling water/heat pumps | NPDES |
| ||
200-J | Filter backwash | NPDES |
| ||
300-J | Fish hatcheries | NPDES |
| ||
400-J | Log ponds | NPDES |
| ||
500-J | Boiler blowdown | NPDES |
| ||
600 | Offstream placer mining | WPCF | |||
700-PM | Suction dredges | NPDES | |||
900-J | Seafood processing | NPDES |
| ||
1000 | Gravel mining | WPCF |
| ||
1200-A | Stormwater permit for gravel mining | NPDES | |||
1200-C | Construction | NPDES | |||
1200-CN | Construction - within certain jurisdictions | NPDES |
| ||
1200-COLS | Industrial stormwater discharging to Columbia Slough | NPDES | |||
1200-Z | Industrial stormwater, not discharging to Columbia Slough | NPDES | |||
1200-ZN | Industrial Stormwater for new facilities not discharging to Columbia Slough (10/1/11-6/30/12) | NPDES | |||
1200-U | Underground injection control general permit | WPCF | Permit | Applications/Fees | More info |
1300-J | Oily stormwater runoff, oil/water separators | NPDES |
|
|
http://www.deq.state.or.us/wq/uic/forms.htm
Registration and Application Forms
Please submit fees and a hard copy of the application to DEQ Headquarters 811 SW 6th Avenue, Portland, OR 97204, and an electronic copy to the UIC Hydrogeologist.
Please see Table 70C for DEQ’s Individual UIC permit fees and Table 70G for DEQ’s General UIC permit fees:
Oregon Administrative Rule 340-045-0075 Tables 70A-H
http://www.deq.state.or.us/wq/uic/uic.htm
Underground Injection Control Program
DEQ’s Underground Injection Control Program is responsible for regulating the construction, operation, permitting, and closure of injection wells that place fluids underground for storage or disposal.
This site provides information for owners and operators of injection wells on how to safely operate injection wells to prevent contamination of underground drinking water resources.
Current News
DEQ Releases New Underground Injection Control General Permit
DEQ’s Underground Injection Control Program has released a new general permit for stormwater underground injection control systems that own or operate less than 50 UICs. A “UIC” is typically a device that injects fluids (in this case stormwater) into the ground. This type of stormwater disposal system is also known as a drywell.
DEQ regulates stormwater UICs to ensure that drinking water is protected from pollutants in stormwater.
Current UIC system operators covered under an individual UIC permit may be eligible for the general permit.Visit our UIC WPCF permits page for more information.
http://www.deq.state.or.us/wq/uic/permits.htm
Replace current “General Permit” titled paragraph with:
General Permit
DEQ now offers a general permit for entities that own or operate less than 50 UICs. DEQ staff will help new applicants and current permit holders determine whether their UIC system should be covered by an individual or general permit.
For more information about this permit, please visit the UIC Contacts page.
KNIGHT William, 2015-12-15T10:49:00Z
Update PDF File
KNIGHT William, 2015-12-15T10:49:00Z
Update PDF File
KNIGHT William, 2015-12-15T10:44:00Z
Hyperlink to PDF of General Permit document.
KNIGHT William, 2015-12-15T12:41:00Z
Hyperlink to PDF Document.
KNIGHT William, 2015-12-15T12:40:00Z
Hyperlink to: http://www.deq.state.or.us/wq/uic/forms.htm
KNIGHT William, 2015-12-15T12:41:00Z
Hyperlink to: http://www.deq.state.or.us/wq/uic/uic.htm
KNIGHT William, 2015-12-15T10:44:00Z
Hyperlink to PDF of General Permit document.
KNIGHT William, 2015-12-15T12:50:00Z
Hyperlink: http://www.deq.state.or.us/wq/uic/permits.htm
KNIGHT William, 2015-12-15T10:58:00Z
Hyper link to PDF of General Permit document.