A | B | C | D | E | G | H | I | |
---|---|---|---|---|---|---|---|---|
1 | DIVISION |
REDLINE/ STRIKEOUT |
SUMMARY TABLE | CROSS REFERENCES | ANNOTATE | 40 CFR | GGMK REVIEW | MISC NOTES |
2 | CHECK DATE (2014) ON CMM AND SSM | |||||||
3 | 200 | done | done | renumber defintions | ||||
4 | 200 tables | done | done | NA | NA | In new format | ||
5 | 202 | done | done | done | done | done | ||
6 | 202 tables | done | done | done | NA | NA | NA | |
7 | 204 | done | done | done | NA | done | NA | |
8 | 206 | done | done | done | NA | done | NA | |
9 | 208 | done | done | done | NA | renumber defintions and fix cross-walk; finish 40% story; talk with Andy about odor control measures | ||
10 | 209 | done | done | NA | NA | NA | NA | |
11 | 210 | done | done | done | NA | NA | NA | |
12 | 212 | done | Update SSM and CMM. | |||||
13 | done | done | NA | done | Where to find the latest CFR dates? JULY 1, 2012 FOR ALL CFR REFERENCES (EXCEPT 238 AND 244 – JERRY) | |||
14 | 214 | done | done | NA | NA | Check western backstop language w/Brian | ||
15 | 216 | 0064(4)(d) | done | NA | NA | extend duration of simple permits? | ||
16 | 216 tables | Table 1Part B 28. | NA | emergency generators over a certain size (or combined size) need to get permit rather than using the emissions, reorder 27, 28, and 29 in alphabetic order or leave as is? | ||||
17 | Table 1 Part B 37 and 38 | grain elevators | ||||||
18 | Table 1 part C 4b. | done | NA | GRUNOW: Part C: item 4.b. requires all sources subject to a RACT, BACT, LAER, NESHAP, NSPS, State MACT, or other significant Air Quality regulation, with > 10 tons/yr. actual emissions have a Standard ACDP (unless exempted elsewhere - see below). The history of this criteria may be the old Minimal Source ACDP threshold. Regional offices likely have sources operating with Simple permits that actually should have Standard permits under this requirement. This is especially true now with the advent of the area source NESHAPs for which many of our sources are now subject. I suggest that we cut this requirement from the rule and make the Simple/Standard applicability distinction based on IMD or policy statement. DO WE NEED TO MOVE SOURCES AROUND TO DIFFERENT PERMITS? | ||||
19 | 218 | done | NA | NA | 0040(3)(c)(C) - reword insignificant activities cross references | |||
20 | 220 | done | done | NA | NA | NA | Have Andrea make these changes? | |
21 | 222 | Figure out cross reference to OAR 340-222-0046(3)(e) in 222-0041(2). fix short term PEL rule language; Add provision for when PM2.5 true-up does not apply (see summary) | ||||||
22 | 224 | |||||||
23 | 225 | done | ||||||
24 | 226 | done | NA |
(0120) Can you add ammonia slip as something to consider a rule
change on? Ammonia isn’t a regulated pollutant, but typically
a limit on ammonia slip is set in PSD permits when an SCR control
system is used. However, it’s not clear what authority we have
to set such a limit. Might be worth clarifying. statewide general vs industry specific? FIGURE OUT STORY FOR OPACITY AND GRAIN LOADING |
||||
25 | 226 tables | NA | NA | NA | NA | NA | NA | |
26 | 228 | NA | NA | Residential Coal | ||||
27 | 232 | NA | NA | NA |
"publication rotogravure printing" defined and included in Subpart
QQ - need definition? renumber defintions; CFR dates? Reference division 238 in 0150(1)(a) or Federal Register? |
|||
28 | 234 | done | NA | NA |
Continual monitoring definition – combine into one with continuous
monitoring? SEE RULES, what to do with wigwam fired burner definition? Move to 200? |
|||
29 | 236 | NA | NA | asphalt plants? | ||||
30 | 240 | see rule | NA | NA | Charcoal rules? Other types of sources in Lakeview? | |||
31 | 242 | done | done | done | NA | NA | spray paint rules - Carrie Ann for repeal analysis | |
32 | 268 | done | NA | NA | NA |
A | B | C | |
---|---|---|---|
1 | TOPIC | STORY FOR EPA | POWER POINT |
2 | Rule Restructure | ||
3 | Repeal 40% and 0.2 gr/dscf and add zeros | ||
4 | Delete 3-minute aggregate opacity limit and use 6-minute averages | ||
5 | Exempt sources with specific standards from general statewide grain loading/opacity standards | ||
6 | PSD 18-month extensions for good cause | ||
7 | Restructure nonattainment and maintenance NSR for non-federal majors - two separate programs for federal majors and non-federal majors | ||
8 | Net Air Quality Benefit | ||
9 | Areas violating NAAQS but not yet designated NAA | ||
10 | Attainment Plan/Maintenance Plan Bridge |