Kitchen Sink Implementation Plan

 

Item

Change needed

Person

Target Date

Date Complete

Administrative forms

 AQ101 - needs new fee table rule number and new names on technical mods

 AQ104 – needs new table rule number and link to table; Type 3 change – new reference to 222-0041(3)(b)

 AQ105 – needs new fee table rule number

   

ACDP webpage

 New table rule number and link

   

ACDP application instructions

 Update table 216 categories

 New fees

 Add section on EGUs

 NSR extensions

 Major NSR changes

 State NSR

 Sustainment/Reattainment

 

   

Basic Permit Applications (ALL)

 Correct fees and table rule number

   

Basic Permits

 Excess emissions general condition

 

   

General Permit Applications

 AQGP-100 fees

 AQGP-1XX – needs new fee table rule number

 

   

General Permits

 Permits that have 0.2 and 40%

 Remove grain loading and opacity from non-PM permits

 6-minute average opacity

   

Simple Permit Template

 6-minute average opacity

   

Simple Review Report Template

    

Standard Permit Template

 6-minute average opacity

   

Standard Review Report Template

    

Title V application instructions

 References to CMM and SSM

 Add links to CFRs

 

   

Title V Permit Template A & B

 6-minute average opacity

   

Title V Review Report Template

    

Title V Source Monitoring and Testing Guidance and Documents

 Update webpage with links to updated CMM and SSM

 Oregon Title V Monitoring and Testing Guidance – update for hog fuel boilers

 Delete repealed rules for aluminum, sulfite pulp, Laterite ore

   

Title V Reporting Forms

 Patty - R1000 instructions

   

Permit Writers’ Manual

Strongly recommend COMS for HF Boilers

   
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     

 

 

 

 

Questions:

1.  Do we need to add emergency generators > 500 hp or aggregate > de minimis to all basic application forms?

2.  How do we add CIA (small boilers and EGUs) to baseline emission rate?

 

 

 

 

To Do for SIP:

1.  Withdraw interpollutant trading ratios from previously submitted SIP but leave in rules