1   Kitchen Sink Implementation Plan        
2 Item FORMS - Change needed Person Target Date Date Complete  
3 Schedule for permit mods/reopenings          
4 Administrative forms AQ101, eastern region - fee table rule number and new names on technical mods        
5 AQ101, western region - fee table rule number and new names on technical mods        
6 AQ101, northwest region - fee table rule number and new names on technical mods        
7 AQ103 - fees and table rule number, correct form # in title        
8 AQ104 instructions – table rule number and link to table; Type 3 change – new reference to 222-0041(3)(b)        
9 AQ105 – fee table rule number        
10 ACDP webpage New table rule number and link        
11 ACDP application instructions Update table 216 categories        
12 New fees        
13 Add section on EGUs        
14 NSR extensions        
15 Major NSR changes        
16 State NSR        
17 Sustainment/Reattainment        
18          
19 Basic Permit Applications (ALL) AQB-001 - fees and fee table rule number        
20 AQB-002 - fees and fee table rule number        
21 AQB-003 - fees and fee table rule number        
22 AQB-004 - fees and fee table rule number        
23 AQB-005 - fees and fee table rule number        
24 AQB-006 - fees and fee table rule number        
25 AQB-007 - fees and fee table rule number        
26 Basic Permits Excess emissions general condition        
27          
28 General Permit Applications AQGP-100 fees        
29 AQGP-101 – fee table rule number        
30 AQGP-102 – fee table rule number        
31 AQGP-103 – fee table rule number        
32 AQGP-104 – fee table rule number        
33 AQGP-105 – fee table rule number        
34 AQGP-106 – fees        
35 AQGP-107 – fee table rule number        
36 AQGP-108 – fee table rule number        
37 AQGP-109 – fee table rule number        
38 AQGP-110 – none        
39 AQGP-111 – fee table rule number        
40 AQGP-112 – fee table rule number        
41 AQGP-113 – fee table rule number        
42 AQGP-114 – fee table rule number        
43 AQGP-115 – fee table rule number        
44 AQGP-116 – fee table rule number        
45 AQGP-117 – fee table rule number        
46 AQGP-118 – fee table rule number        
47 AQGP-119 – fee table rule number        
48 AQGP-120 – fee table rule number        
49 AQGP-122 – none        
50 AQGP-124 – fee table rule number        
51 AQGP-125 – none        
52 AQGP-126 – fees        
53 AQGP-127 – fees        
54 AQGP-128 – fee        
55 AQGP-130 – fee        
56 General Permits AQGP-001 hard chrome - opacity? 30 seconds, gr/dscf? fugitives, fallout, fees        
57 AQGP-002 dec chrome - opacity? 30 seconds, gr/dscf? fugitives, fallout, fees        
58 AQGP-003 cold batch degreaser - opacity, 30 seconds, gr/dscf, fugitives, fallout, fees        
59 AQGP-004 vapor/inline degreasers-opacity, gr.dscf?, fugitives, fallout, fees        
60 AQGP-005 all degreasers – opacity, gr/dscf? fugitives, fallout, fees        
61 AQGP-006 dry cleaners – fees        
62 AQGP-007 asphalt – may need 0.10 before 10/1/17 expiration, 40%, 30 seconds, fugitives, fees        
63 AQGP-008 rock crushers – 30 seconds, 20% 3 min/hr in 4 counties? excess emissions (3 in 60), fees        
64 AQGP-009 concrete – 30 seconds, 20% 3 min/hr in 4 counties? excess emissions (3 in 60), fees        
65 AQGP-010 sawmills – may need 0.10 before 10/1/17 expiration, 40%, 30 seconds, excess emissions (3 in 60), line/table spacing, 6.6.a.a., fees        
66 AQGP-011 boilers – may need 0.10 before 10/1/17 expiration, 30 secconds, excess emissions (3 in 60), fees        
67 AQGP-012 crematories – excess emissions (3 in 60), fees        
68 AQGP-013 grain elevators – may need 0.10 before 10/1/21 expiration, 30 seconds,excess emissions (3 in 60), fees        
69 AQGP-014 grain milling – 30 seconds, may need 0.10 before 10/1/21 expiration, excess emissions (3 in 60), fees        
70 AQGP-015 seed cleaning – 30 seconds, may need 0.10 before 10/1/21 expiration, excess emissions (3 in 60), fees        
71 AQGP-016coffee roasting – 30 seconds, may need 0.10 before 10/1/21 expiration, excess emissions (3 in 60), fees        
72 AQGP-017 bulk plant – opacity? 30 seconds, fallout? excess emissions (3 in 60), fees        
73 AQGP-018 electric power – 30 seconds, may need 0.10 before 10/1/21 expiration, excess emissions (3 in 60), fees        
74 AQGP-018a electric power – fees        
75 AQGP-019 ceramic mfg – 30 seconds, fees        
76 AQGP-020 hospital sterilizers – 30 seconds, fees        
77 AQGP-020a hospital sterilizers – none        
78 AQGP-022 GDF I – opacity? 30 seconds, fallout? Fees        
79 AQGP-022a GDF I – none        
80 AQGP-023 GDF II – opacity? 30 seconds, fallout? Fees        
81 AQGP-023a GDF II – none        
82 AQGP-024 wood preserving – 30 seconds, fees        
83 AQGP-024a wood preserving – header on 2nd page, 30 seconds        
84 AQGP-025 large metal fab – 30 seconds, fees        
85 AQGP-025a large metal fab – fees        
86 AQGP-026 plating/polishing – 30 seconds, excess emissions (3 in 60), fees        
87 AQGP-026a plating/polishing – none        
88 AQGP-027 surface coating – fees        
89 AQGP-027a surface coating – none        
90 AQGP-028 paint stripping– 30 seconds, fees        
91 AQGP-028a paint stripping– none        
92 AQGP-029 small metal fab – 30 seconds, fees        
93 AQGP-029a small metal fab – fees        
94 AQGP-030 paint mfg – 30 seconds, may need 0.10 before 10/1/23 expiration, fees        
95 AQGP-030a paint mfg – fees        
96 General Permit Assessment Report AQGP-001r – OAR 340-200-0020 tables 2 & 3        
97 AQGP-002r – OAR 340-200-0020 tables 2 & 3        
98 AQGP-003r – OAR 340-200-0020 tables 2 & 3        
99 AQGP-004r – none        
100 AQGP-005r – none        
101 AQGP-006r – OAR 340-200-0020 tables 2 & 3        
102 AQGP-007r – OAR 340-200-0020 tables 2 & 3        
103 AQGP-008r – OAR 340-200-0020 tables 2 & 3        
104 AQGP-009r – OAR 340-200-0020 tables 2 & 3        
105 AQGP-010r – OAR 340-200-0020 tables 2 & 3        
106 AQGP-011r – OAR 340-200-0020 tables 2 & 3        
107 AQGP-012r – OAR 340-200-0020 tables 2 & 3        
108 AQGP-013r – OAR 340-200-0020 tables 2 & 3        
109 AQGP-014r – OAR 340-200-0020 tables 2 & 3        
110 AQGP-015r – OAR 340-200-0020 tables 2 & 3        
111 AQGP-016r – OAR 340-200-0020 tables 2 & 3        
112 AQGP-017r – OAR 340-200-0020 tables 2 & 3        
113 AQGP-018r – OAR 340-200-0020 tables 2 & 3        
114 AQGP-019r – OAR 340-200-0020 tables 2 & 3        
115 AQGP-020r – OAR 340-200-0020 tables 2 & 3        
116 AQGP-022r – OAR 340-200-0020 tables 2 & 3        
117 AQGP-023r – OAR 340-200-0020 tables 2 & 3        
118 AQGP-024r – OAR 340-200-0020 tables 2 & 3        
119 AQGP-025r – OAR 340-200-0020 tables 2 & 3        
120 AQGP-026r – OAR 340-200-0020 tables 2 & 3        
121 AQGP-027r – OAR 340-200-0020 tables 2 & 3        
122 AQGP-028r – OAR 340-200-0020 tables 2 & 3        
123 AQGP-029r – OAR 340-200-0020 tables 2 & 3        
124 AQGP-030r – OAR 340-200-0020 tables 2 & 3        
125 General permit Annual Reporting Forms AQGP-R01 through AQGP-R02 - add regional office addresses        
126 AQGP-R03 through AQGP-R13 - logo, addresses        
127 AQGP-R11 - change cubic feet of NG to therms, logo        
128 AQGP-R14 through AQGP-R14, addresses        
129 AQGP-R15 through AQGP-R18 - logo, addresses        
130 AQGP-R019 through AQGP-R029 - fix numbering (0) on forms and website        
131 AQGP-R019 through AQGP-R024 - logo, addresses        
132 AQGP-R025 through AQGP-R030 - addresses        
133 Simple, standard & Construction ACDP Application Forms AQ202 - none        
134 AQ203 - none        
135 AQ204 - none        
136 AQ205 - more drop downs?        
137 AQ206 - none        
138 AQ207 - none        
139 AQ208 - none        
140 AQ209 - none        
141 AQ210 - none        
142 AQ211 - #/gal.        
143 AQ212 - none        
144 AQ213 power generators - PM2.5 EF, GHG?        
145 AQ214 - none        
146 AQ216 - none        
147 AQ220 - none        
148 AQ221 - none        
149 AQ222 - none        
150 AQ223 - none        
151 AQ224 - none        
152 AQ225 - none        
153 AQ226 - none        
154 AQ230 - none        
155 AQ231 - none        
156 Pollution Prevention AQ300s - none        
157 Emissions Forms Instructions for ACDP AQ400 Forms - netting basis        
158 Instructions for PM2.5 PSEL and NB - none        
159 AQ401 - Baseline Emission Rate instructions - move definition to division 222        
160 AQ402 - Current/Future Emissions - none        
161 AQ403 - HAP Emissions - none        
162 Emission Factors - none        
163 Source Monitoring and Testing Guidance and Documents Change "guidance"        
164 New links for SSM and CCM        
165 Add SSM Volume II        
166 Change Title V Monitoring and Testing "Guidance" and update (HFB monitoring- multiclone O&M?). Also needs reformatting [EPA general trial permits for hot mix asphalt and rock crushing - weekly!]        
169 ACDP permit addendum opacity+6 min avg/grain loading/fugitive/250 micron        
170 ACDP Permit template Regardless of the PSEL compliance requirements specified in a permit, actual emissions from a source or part of a source may be calculated for any given 12 consecutive month period using data that is considered valid and representative of the source’s or part of a source’s emissions. Actual emissions must be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.        
171 Relocation Notice Needs DEQ logo (is this for portable asphalt plants only? If not, revise)        
172 ACDP Rules Make sure links get updated to new rules and tables        
173 Enforcement policy for smaller sources, for new rules not in permits        
174            
175 Title V Application Guide Book - none        
176 Administrative and General Facility Information 112(r) List, OAR division 224 Table 3 - delete?        
177 AP101 - logo        
178 AP101M - logo        
179 AP101R - logo        
180 AP102 - logo        
181 AP103 - logo        
182 AP104A - logo        
183 AP104B - none        
184 AP104C - none        
185 AP105 - logo        
186 AP106 - drop downs?        
187 Device/Process Description Series DV200 Instructions - none        
188 DV201 through DV212 - none        
189 Pollution Control Device Description Series CD300 Instructions - none        
190 CD301 through CD306 - none        
191 Applicable Requirements Series AR400 Instructions - logo        
192 AR401 - update rule numbers        
193 AR401S - state vs federal enforceable - update all (HUGE)        
194 AR401A - NSPS/NESHAP applicability - JERRY        
195 AR402 - none        
196 AR403 - none        
197 AR404 - none        
198 Emissions Unit Summary Series EU500 Instructions - none        
199 EU501 through EU504- logo        
200 Emissions Data Series ED600 Instructions - clarify ED605S only for Medford        
201 ED601 - update categorially insignificant activities        
202 ED605 - logo        
203 ED605A-example - logo        
204 Monitoring & Testing Series CP700 Instructions - update for PM2.5 test method?        
205   CP701 through CP711 - none        
206 Miscellaneous Series MF800 Instructions - none        
207 MF801 - none        
208 Modification forms & Instructions Series MD900 Instructions -
- unless otherwise specified in OAR 340-2
18-0190(2)
- In accordance with OAR 340
-028-2270(3)(f)-210-0240(3), the Notice of Approval procedures
- OAR 340-222-0041
(3)(b)(4)
- Per OAR 340-218-0040(5) and 340-218-0080(3)(c)(D), owners/operators are required to certify this application. {strikeout is certification for compliance with PERMIT, this is on multiple forms}
- Title I modifications (OAR 340-
28-110200-0020);
- enhanced permitting procedures (OAR 340-218
8-0190(2)(b)(B))
- alternative emissions limit approved pursuant to OAR
340-32-300 through 340-32-380340-244-0100 through 340-244-0200;
- are not required by OAR
340-28-2260340-218-0180 to be processed as a significant modification
- Indicate (yes or no) whether this application is being used to incorporate the requirements of a construction approval (OAR
340-28-2270340-218-0190) into the Permit.
- If the construction approval involved a Type 3 or 4 change, indicate (yes or no) whether the enhanced permitting procedures (OAR
340-28-2270(3)(c)(B)(iv) 340-218-0210 and 340-218-0230)
- corrections when more accurate data are obtained but does not increase actual emissions [OAR 340-218-0150(1)(
i)]; or
- incorporation into the Permit of requirements from Construction ACDPs authorized under OAR 340-218-0190 and 340-210-0240(1)
©(c), unless otherwise specified in OAR 340-218-0190(2);
       
209 MD901 thourgh MD906 - none        
210 Reporting Forms Series R1000 Instructions
- Since it is not required that the forms be submitted electronically, the owner/operator may convert these to any other computer software that is compatible with their system. In adition, the ower/operator may propose alternative formats as long as all of the information requested in the forms supplied by DEQ is capatured on the alternative forms. The owner/operaor should obtain aprpoval from DEQ before submitting an alternative format.
- Significant figures - grain loading
- Short-term PSEL "each" permit establishes short-term PSELs
- link to "White Paper II" for no monitoring for insignificant activities
- link to CMM and SSM
- off-Permit change or a section 502(b)(10) change (OAR 340-218-0140 and general conditions G1
34 and G145),......If this notification is not sent, the owner/operator would have to report intermittent compliance with the reporting requirement to submit such notifications (general conditions G134 and G145).
- Failure to submit an application for construction approval would require the owner/operator to report intermittent compliance with the application requirement (General Conditions G
1920 and G2021).
- Failure to submit an application for an administrative amendment would require the owner/operator to report intermittent compliance with the administrative amendment application requirements (General Condition G1
56).
- If an application for a Permit modification was not submitted by the owner/operator, intermittent compliance with the modification application requirements must be reported (General Conditions G1
67 and G178).
- In addition, conditions 1, 2,
G1, G2, G3, G11, G22, G24, G25, G27, and G28 do not have to be listed.
       
211 R1001-B and C - logo        
212 R1003 - fix title Permit Deviation Summary        
213 R1006 - fix title Title V Excess Emissions IMMEDIATE Notification        
214   F1100 Series Instructions - Fees {WAIT FOR PROBLEM SOLVING GROUP}        
215 Title V permit template A fugitives - oil application        
216 Title V permit template B          
217 Title V permit addendum opacity+6 min avg/grain loading/fugitive/250 micron        
218 Permit addendum for ALL Title V permits "modified Method 9"        
219 Title V Permit template Regardless of the PSEL compliance requirements specified in a permit, actual emissions from a source or part of a source may be calculated for any given 12 consecutive month period using data that is considered valid and representative of the source’s or part of a source’s emissions. Actual emissions must be calculated using the unit's actual operating hours, production rates, and types of materials processed, stored, or combusted during the selected time period.        
220 Permitting for SharePoint          
222 Questions:          
223 1.      Do we need to add emergency generators > 500 hp or aggregate > de minimis to all basic application forms?    
224 2.      How do we add CIA (small boilers and EGUs) to baseline emission rate?        
226 To Do for SIP:          
227 1.      Withdraw interpollutant trading ratios from previously submitted SIP but leave in rules        