RM-AQPerm: THINGS TO DO
Outstanding rule issues:
• Check all comments for outstanding issues
• EPA review: Major Mod, NAQB and 222-0041, especially (6) (George and Jill)
• Finalize 224-0025 (major mod) after EPA call (George)
• Paul Garrahan rule review in February (Jill)
• Senior permit writers rule review in February (all)
• Update rules based on senior permit writers review (Jill)
• Delete old version of 222-0041(6) (George)
• Revise 222-0041(6) by adding “or Type A State NSR” in (6)(c) (George)
• 224-0025(3)(e), last line, add “recent”
• Schedule a call with EPA to discuss item above (Jill)
• 1-25-15, significant rewrite of 224-0030(5) done, needs final review and answer to the question in the comments (Jill and George)
• 224 – check all pointers to NAQB for non-ozone pollutants in major and state NSR (George, done, all good, some tweaks made at the same time)
• Review definition of “federal major source” and check for “any source listed in subsections (?) and (?) (George - done, it’s ok)
• 224-0030 - Review the NSR/PSD extension language I added from EPA’s memo (George)
• Revise biomass deferral language in (I think) definition of GHGs per emails/discussion with EPA (court vacated the deferral). (language removed by Jill)
• 222-0035 – PSELs for CIA (Medford 5 tpy SER) (George discussed with Claudia on 1-23-15 after discussion with EPA, we probably have to handle this as an implementation issue)
• 224/225 – add Paul G comments (Jill)
• 224-0010(2) Check for “SER over the NB” vs. “SER” (George)
• 226 and 228 – grain loading: need more than 5 years for representative source test data? (Jill)
• Division 232 changes (done - George)
• The list in 340-232-0010(3) needs to be made consistent with how rules are actually labeled (done, George)
• 240-0550 – this rule is completely screwed up (George)
• Division 268, problems with using 240-0560 in all areas, can’t without a showing, need to revise language (George)
• Update RTC
• Update RTC based on senior permit writers rule review
• Revise RTC section 6.10 following discussion with EPA on major mod calcs
• Revise RTC section 6.19 and 6.20 following internal discussion (George)
• Update crosswalk (Jill)
• Redline all rules moved in SOS version rather than redline/strikeout (Jill)
• Check RTC to be sure it describes changes to 232 accurately (George)
• offset ratio in sustainment areas in (George)
• RTC 5.1 needs to be revised, it’s inaccurate (George)
• RTC 1.25 has wonky language (Jill)
• Check RTC section 6.9, revise if necessary (Jill)
• Rewrite first two paragraphs of RTC 6.17
• Check proposed rule language against current for 222-0041 and all of 224 (Jill)
• Check formatting of rules (Jill)
• Revise the Real Big table of changes (George)
TO DOs before February 10/11 Senior Permit Writers Training in Eugene:
• Prepare proposed rule document with existing rules (Jill) (02/10-11/15 forum)
TO DOs before package goes to EQC March 1:
▪ Respond to Stephanie comments (Jill)
▪ Respond to Andrea comments (Jill (on GHG RTC))
▪ Respond to Lydia comments (Jill)
▪ Finalize roadmap (George, Jill and Paul)
TO DOs before the EQC meeting April 15/16:
▪ Schedule individual EQC meetings (Jill)
▪ EQC presentation (Jill and George – Jill will take the lead)
▪ Make hard copies and tag roadmap items (Tim)
TO DOs shortly after rule adoption:
▪ Verify implementation plan and enforceability of new rules with Paul G (Jill)
▪ Verify implementation plan and enforceability of new rules with RMT (Jill)
❖ Wood-fired boiler addendum
❖ Email to all permit writers about schedule – at renewals?
▪ Talk with RMT about inspectors’ forum(s) (Jill and George) (May 4/5/6, 2015)
▪ Inspectors’ Forum materials (Jill and George– Jill will take the lead)
▪ Update forms (Tim and Jill)
▪ Update templates (Tim and Jill)
▪ Schedule roadshow (Jill)
▪ Hit the Road (Jill and George)