BASIC
AIR CONTAMINANT DISCHARGE PERMIT
Department of Environmental Quality
This permit is being issued in accordance with the provisions of ORS 468A.040 and
based on the land use compatibility findings included in the permit record.
ISSUED TO:
<Company Legal Name> <Mailing Address> <City, State, Zip> | INFORMATION RELIED UPON:
Application No.: 0 Date Received: <mm/dd/yy>
|
PLANT SITE LOCATION:
<Street Address> <City, County, Zip Code>
|
LAND USE COMPATABILITY STATEMENT:
Approving Authority: <Name> Approval Date: <mm/dd/yy> |
PERMIT PREVIOUSLY ISSUED TO:
<Company legal name> |
ISSUED BY THE DEPARTMENT OF ENVIRONMENTAL QUALITY
____________________________________________ _______________________
Air Quality Manager Dated
Source(s) Permitted to Discharge Air Contaminants (OAR 340-216-0020):
Table 1 Code | Source Description | SIC |
Part A, 1 | Autobody repair or painting shops painting more than 25 automobiles in a year. | 7532 |
1.0 STATEMENT OF PURPOSE
1.1 1 | Permitted Activities | The permittee is allowed to discharge air contaminants from processes and activities related to the air contaminant source(s) listed on the first page of this permit until this permit expires, is modified, revoked or rescinded as long as the permittee complies with the conditions of this permit. |
2.0 EMISSION STANDARDS AND LIMITS
2.1 Production limits | The permittee is prohibited from using more than 3,500 gallons of paint per year without first notifying DEQ. |
2.2 Motor Vehicle Refinishing | Unless an alternative method is approved by DEQ, the permittee must apply motor vehicle refinishing coatings by one of the following methods: |
a. high volume-low pressure (HVLP) spray equipment operated and maintained in accordance with the manufacturer’s recommendations; | |
b. electrostatic application equipment operated and maintained in accordance with the manufacturer’s recommendations; | |
c. dip coat application, | |
d. flow coat application; | |
e. brush coat application; | |
f. roll coat application; or | |
g. hand-held aerosol cans. | |
2.3 Cleaning | The permittee must clean any spray equipment, including paint lines, in a device that: |
a. minimizes solvent evaporation during the cleaning, rinsing, and draining operations; | |
b. recirculates solvent during the cleaning operation so the solvent is reused; and | |
c. collects spent solvent to be available for proper disposal or recycling | |
2.4 Fugitive Emissions | The permittee must take reasonable precautions for preventing fugitive dust emissions. |
2.5 Particulate Matter Fallout | The permittee must not cause or permit the emission of any particulate matter larger than 250 microns in size at sufficient duration or quantity, as to create an observable deposition upon the real property of another person. |
2.6 Nuisance and Odors | The permittee must not cause or allow air contaminants from any source to cause a nuisance. Nuisance conditions will be verified by DEQ personnel. |
2.7 Other Regulations | In addition to the specific requirements listed in this permit, the permittee must comply with all other legal requirements enforceable by DEQ. |
3.0 RECORDKEEPING AND REPORTING REQUIREMENTS
3.1 Records | The permittee must maintain records of the information identified in Condition 3.2 for at least five years from the date of the record. |
3.2 Reports | The permittee is required to report to DEQ by February 15th of each year the following information: |
a. Number of automobiles painted during the previous calendar year; | |
b. Number of gallons of paint used during the previous calendar year; | |
c. Written log of all air quality or nuisance complaints and how each complaint was handled; and | |
d. Certification that the permittee is in compliance with motor vehicle refinishing requirements set forth in Conditions 2.2 and 2.3. | |
3.3 Permit Renewal | An application to renew the permit is due <date>. |
3.4 Construction or Modification Notices | The permittee must notify DEQ before adding new or modifying existing equipment to the extent that process equipment is substantially changed or added to, or emissions are significantly changed or increased. |
3.5 Notice of Change of Ownership or Company Name | The permittee must promptly notify DEQ of any change of mailing address, company name, or plant ownership. The permit will expire 60 days after a change in the legal entity owning/operating the facility unless application, with appropriate fees, is made to transfer the permit to the new entity. |
3.6 Where to Send Reports and Notices | The reports and notices, with the permit number prominently displayed, must be sent to the regional office identified on the cover page of the permit. |
4.0 Fees
4.1 Fees | The Annual Fee specified in OAR 340-216-8020, Table 2, Part 2 for a Basic ACDP is due on December 1 of each year this permit is in effect. An invoice indicating the amount, as determined by DEQ regulations, will be mailed prior to the above date. |
5.0 General Conditions
5.1 Masking of Emissions | The permittee must not cause or permit the installation of any device or use any means designed to mask the emissions of an air contaminant that causes or is likely to cause detriment to health, safety, or welfare of any person or otherwise violate any other regulation or requirement. |
5.2 Open Burning | The permittee may not conduct any open burning except when approved by DEQ in advance. |
5.3 Asbestos | All activities involving asbestos-containing materials, including, but not limited to, demolition, renovation, repair, construction, and maintenance must be performed by persons certified for asbestos abatement projects. Accumulation of asbestos containing material is prohibited. If you have asbestos questions, contact the regional DEQ office identified below. |
5.4 Permit Availability | The permittee must have a copy of the permit available at all times. |
5.5 DEQ Inspections | The permittee must allow DEQ’s representatives access to the plant site and pertinent records at all reasonable times for the purposes of performing inspections, surveys, collecting samples, obtaining data, reviewing and copying air contaminant emissions discharge records and conducting all necessary functions related to this permit. |
5.6 Legal Disclaimers | The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of federal, state, or local laws or regulations. |
5.7 Permit Revocation | This permit is subject to revocation for cause. |
5.8 DEQ Contact | Call the Air Quality Section of the regional office in at . |
Permit Template Coordinator, 2011-05-31T10:52:00Z
Page: 1
This section should only be used if name of company changed during last permit term. Highlight and delete to remove.
mfisher, 2011-05-31T10:52:00Z
Should be 60 days before permit expires.