340-045-0075

Permit Fee Schedule

(1) The fee schedule for onsite sewage disposal system permits, including WPCF permits, and graywater reuse and disposal system WPCF individual permits is found in OAR chapter 340, division 071.

(2) The department has established fees for various industrial, domestic and general permit categories. The industrial and domestic permit categories and fees are listed in Tables 70B and 70C. The general permit categories are defined in OAR 340-045-0033 and the fees are listed in Table 70G.

(3) The department must consider the following criteria when classifying a facility for determining applicable fees. For industrial sources that discharge to surface waters, discharge flowrate refers to the system design capacity. For industrial sources that do not discharge to surface waters, discharge flow refers to the total annual flow divided by 365:

(a) Tier 1 industry. A facility is classified as a Tier 1 industry if the facility:

(A) Discharges at a flowrate that is greater than or equal to 1 mgd; or

(B) Discharges large biochemical oxygen demand loads; or

(C) Is a large metals facility; or

(D) Has significant toxic discharges; or

(E) Has a treatment system that will have a significant adverse impact on the receiving stream if not operated properly; or

(F) Needs special regulatory control, as determined by the department.

(b) Tier 1 domestic facility. A facility is classified as a Tier 1 domestic facility if the facility:

(A) Has a dry weather design flow of 1 mgd or greater; or

(B) Serves an industry that can have a significant impact on the treatment system.

(c) Tier 2 industry or domestic facility: does not meet Tier 1 qualifying factors.

(4) New-permit application fee. Unless waived by this rule, the applicable new-permit application fee listed in Table 70A, 70C or 70G (available on the department's website or upon request) must be submitted with each application. The amount of the fee is based on the facility category and type of permit (e.g., individual vs. general).

(5) Permit modification fee. Permit modification fees are listed in Tables 70A and 70C (available on the department's website or upon request). They vary with the type of permit, the type of modification and the timing of modification as follows:

(a) Modification at time of permit renewal:

(A) Major modification — involves an increase in effluent limitations or any other change that involves significant analysis by the department;

(B) Minor modification — does not involve significant analysis by the department.

(b) Modification prior to permit renewal:

(A) Major modification — involves an increase in effluent limitations or any other change that involves significant analysis by the department. A permittee requesting a significant modification to their permit may be required by the department to enter into an agreement to pay for these services according to ORS 468.073. ORS 468.073 allows the department "to expedite or enhance a regulatory process by contracting for services, hiring additional staff or covering costs of activities not otherwise provided during the ordinary course of department business;"

(B) Minor modification — does not involve significant analysis by the department.

(6) Annual fees. Applicable annual fees for General and Industrial permit holders may be found in Tables 70G and 70B (available on the department's website or upon request). Annual fees for domestic sources may also be found in Table 70C (available on the department's website or upon request), and consist of the following:

(a) Base annual fee. This is based on the type of treatment system and the dry weather design flow;

(b) Population-based fee. A permit holder with treatment systems other than Type F (septage alkaline stabilization facilities) must pay a population-based fee. The applicable fee may be found in Table 70D (available on the department's website or upon request);

(c) Pretreatment fee. A source required by the department to administer a pretreatment program pursuant to federal pretreatment program regulations (40CFR, Part 403; January 29, 1981 and amendments thereto) must pay an additional annual fee plus a fee for each significant industrial user specified in their annual report for the previous year. The applicable fee may be found in Table 70E (available on the department's website or upon request).

(7) Technical activities fee. Technical activity fees are listed in Tables 70F and 70H (available on the department's website or upon request). They are categorized as follows:

(a) All permits. A permittee must pay a fee for NPDES and WPCF permit-related technical activities. A fee will be charged for initial submittal of engineering plans and specifications. Fees will not be charged for revisions and re-submittals of engineering plans and specifications or for facilities plans, design studies, reports, change orders, or inspections;

(b) General permits. A permittee must pay the technical activity fee shown in Table 70H (available on the department's website or upon request) when the following activities are required for application review:

(A) Disposal system plan review;

(B) Site inspection and evaluation.

(8) For permits administered by the Oregon Department of Agriculture, the following fees are applicable until superseded by a fee schedule established by the Oregon Department of Agriculture:

(a) WPCF and NPDES General Permits #800 for Confined Animal Feeding Operations Filing Fee — $50;

(b) Individual Permits:

(A) Filing Fee — $50;

(B) New applications — $6,280;

(C) Permit renewals (including request for effluent limit modifications) — $3,140;

(D) Permit renewals (without request for effluent limit modifications) — $1,416;

(E) Permit modifications (involving increase in effluent limit modifications) — $3,140;

(F) Permit modifications (not involving an increase in effluent limitations) — $500;

(G) Annual compliance determination fee for dairies and other confined feeding operations — $705;

(H) Annual compliance determination fee for facilities not elsewhere classified with disposal of process wastewater — $1,885;

(I) Annual compliance determination fee for facilities not elsewhere classified that dispose of non-process wastewater (e.g., small cooling water discharges, boiler blowdown, filter backwash, log ponds) — $1,180.

(c) Annual compliance determination fee for facilities that dispose of wastewater only by evaporation from watertight ponds or basins — $705.

(9) A surcharge in the amount listed below is imposed on municipalities that are permittees as defined in 2007 Oregon Laws chapter 696, section 2. The surcharge is imposed to defray the cost of conducting and administering the study of persistent pollutants discharged in the State of Oregon required under 2007 Oregon Laws chapter 696, section 3. A permittee subject to the surcharge must pay one half of the surcharge on or before July 15, 2008 and the other half of the surcharge on or before July 15, 2009.

Each municipality will pay a surcharge based on a dry weather design flow in millions of gallons per day (mgd) as follows:

less than 5 mgd = $6,975.

5 mgd to 9.9 mgd = $13,950.

10 mgd and greater = $20,925.

[ED. NOTE: Tables referenced are not included in rule text. Click here for PDF copy of table(s).]

Stat. Auth.: ORS 468.020, 468B.020 & 468B.035
Stats. Implemented: ORS 468.065, 468B.015, 468B.035 & 468B.050
Hist.: DEQ 113, f. & ef. 5-10-76; DEQ 129, f. & ef. 3-16-77; DEQ 31-1979, f. & ef. 10-1-79; DEQ 18-1981, f. & ef. 7-13-81; DEQ 12-1983, f. & ef. 6-2-83; DEQ 9-1987, f. & ef. 6-3-87; DEQ 18-1990, f. & cert. ef. 6-7-90; DEQ 10-1991, f. & cert. ef. 7-1-91; DEQ 9-1992, f. & cert. ef. 6-5-92; DEQ 10-1992, f. & cert. ef. 6-9-92; DEQ 30-1992, f. & cert. ef. 12-18-92; DEQ 20-1994, f. & cert. ef. 10-7-94; DEQ 4-1998, f. & cert. ef. 3-30-98; Administrative correction 10-22-98; DEQ 15-2000, f. & cert. ef. 10-11-00; DEQ 2-2002, f. & cert. ef. 2-12-02; DEQ 7-2004, f. & cert. ef. 8-3-04; DEQ 5-2005, f. & cert. ef. 7-1-05; DEQ 11-2006, f. & cert. ef. 8-15-06; DEQ 5-2007, f. & cert. ef. 7-3-07; DEQ 8-2008, f. 6-27-08, cert. ef. 7-1-08; DEQ 7-2010, f. 8-27-10, cert. ef. 9-1-10; DEQ 9-2011, f. & cert. ef. 6-30-11; DEQ 15-2011, f. & cert. ef. 9-12-11; DEQ 6-2012, f. f. 10-31-12, cert. ef. 11-1-12

 

 

 

OAR 340-045-0075

 

Permit Fee Schedule

 

 

Table 70A

Industrial NPDES and WPCF Individual Permit Application and Modification Fees

DEQ Class

New Permit

Application Fee1

Major Modification at Permit Renewal

Major Modification Prior to Permit Expiration

Minor Modification

Permit Transfer

Tier 1

$52,111

$13,091

$26,015

$912

$82

Tier 2

$10,487

$3,328

$5,199

$912

$82

Special WPCF permits issued pursuant to OAR 340-045-0061

$497

N/A

N/A

N/A

$82

1. New permit applications must include the annual fee specified in Table 70B in addition to the new permit application fee.

 

 

 

 

Table 70B

Industrial NPDES and WPCF Individual Permit Annual Fees

Type

Description

NPDES

Tier 1

NPDES

Tier 2

WPCF Tier 1

WPCF Tier 2

B01

Pulp, paper, or other fiber pulping industry

$18,222

N/A

$16,912

N/A

 

Food or beverage processing - includes produce, meat, poultry, seafood or dairy for human, pet, or livestock consumption

B02

Washing or packing only

N/A

$2,533

N/A

$2,330

B03

Processing – small. Flow ≤ 0.1 mgd, or 0.1 < flow < 1 mgd for less than 180 days per year

N/A

$3,787

N/A

$3,583

B04

Processing – medium. 0.1 mgd < Flow < 1 mgd for 180 or more days per year, or flow ≥ 1 mgd for less than 180 days per year

N/A

$5,344

N/A

$5,140

B05

Processing – large. Flow ≥ 1 mgd for 180 or more days per year

$18,222

$16,011

$16,912

$15,805

 

Primary Smelting or Refining

B06

Aluminum

$18,222

$16,011

$16,912

$15,805

B07

Non-ferrous metals utilizing sand chlorination separation facilities

$18,222

$16,011

$16,912

$15,805

B08

Ferrous and non-ferrous metals not elsewhere classified

$10,421

$8,208

$9,111

$8,006

B09

Chemical manufacturing with discharge of process wastewater

$18,222

$16,011

$16,912

$15,805

B10

Cooling water discharges in excess of 20,000 BTU per second

$10,421

$8,208

$9,111

$8,006

 

Mining Operations – includes aggregate or ore processing

B11

Large (over 500,000 cubic yards per year or involving chemical leaching)

$18,222

$16,011

$16,912

$15,805

B12

Medium (100,000 to 500,000 cubic yards per year)

N/A

$5,605

N/A

$5,401

B13

Small (less than 100,000 cubic yards per year)

N/A

$1,706

N/A

$1,502

 

All facilities not elsewhere classified which dispose of process wastewater (includes remediated groundwater)

B14

Tier 1 sources

$18,222

N/A

$16,912

N/A

B15

 

Tier 2 sources

N/A

$3,526

N/A

$3,325

B16

All facilities not elsewhere classified which dispose of non-process wastewaters (for example: small cooling water discharges, boiler blowdown, filter backwash)

N/A

$2,361

N/A

$2,157

B17

Dairies, fish hatcheries and other confined feeding operations on individual permits

N/A

$2,066

N/A

$1,864

B18

All facilities which dispose of wastewater only by evaporation from watertight ponds or basins

N/A

N/A

N/A

$1,370

 

Timber and Wood Products

B19

Sawmills, log storage, instream log storage

$5,111

$2,900

$3,802

$2,695

B20

Hardboard, veneer, plywood, particle board, pressboard manufacturing, wood products

$5,404

$3,194

$4,096

$2,991

B21

Wood preserving

$4,573

$2,361

$3,263

$2,157

 

 

Table 70C

Domestic NPDES and WPCF Individual Permits

 

Description

Type

Classification Criteria

(Based on Average Dry Weather Design Flow,

or as defined in 40CFR)

Class

New Permit

App.Fee1

Base

Annual Fee,

5 year

permits

Base

Annual Fee,

10 year

permits

Additional

Annual Fees

Major

Modification

Minor

Modification

Nondischarging

lagoons

E

N/A

Tier 2

$3,398

N/A

$1,085

Additional fees

include population

and pretreatment

fees. See tables

70D and 70E for

determination of

these fees.

$1,740

$912

Lagoons that

discharge to

surface waters

Db

Flow < 1 mgd

Tier 2

$6,710

$1,301

N/A

 

$3,398

$912

 

C2b

1 mgd ≤ Flow < 2 mgd

Tier 1

$33,221

$3,429

N/A

 

$16,651

$912

 

C1b

2 mgd ≤ Flow < 5 mgd

Tier 1

$33,221

$4,698

N/A

 

$16,651

$912

 

Bb

5 mgd ≤ Flow < 10 mgd

Tier 1

$33,221

$6,755

N/A

 

$16,651

$912

Treatment systems

other than lagoons

 

Da

Flow < 1 mgd

Tier 2

$6,710

$1,846

$1,713

 

$3,398

$912

 

C2a

1 mgd ≤ Flow < 2 mgd

Tier 1

$33,221

$5,830

$4,994

 

$16,651

$912

 

C1a

2 mgd ≤ Flow < 5 mgd

Tier 1

$33,221

$8,590

$7,755

 

$16,651

$912

 

Ba

5 mgd ≤ Flow < 10 mgd

Tier 1

$33,221

$12,775

$11,939

 

$16,651

$912

 

A3

10 mgd ≤ Flow < 25 mgd

Tier 1

$33,221

$19,928

N/A

 

$16,651

$912

 

A2

25 mgd ≤ Flow < 50 mgd

Tier 1

$33,221

$42,282

N/A

 

$16,651

$912

 

 

A1

≥ 50 mgd

Tier 1

$33,221

$71,943

N/A

 

$16,651

$912

Septage alkaline

stabilization facilities

F

N/A

Tier 2

$912

N/A

$374

N/A

N/A

$414

 

 

 

 

Table 70C

Domestic NPDES and WPCF Individual Permits

 

Description

Type

Classification Criteria

(Based on Average Dry Weather Design Flow,

or as defined in 40CFR)

Class

New Permit

App.

Fee1

Base

Annual Fee,

5 year

permits

Base

Annual Fee,

10 year

permits

Additional

Annual Fees

Major

Modification

Minor

Modification

Municipal Separate Storm Sewer System

 

Phase 1

See 40 CFR §122.26

N/A

$18,449

$4,153

N/A

N/A

N/A

$1,603

 

Phase 2

 

N/A

$826

$850

N/A

N/A

N/A

$1,603

Underground Injection Control

Various

As defined in 40 CFR parts 9, 144, 145 and 146

N/A

$10,487

N/A

$2,157

N/A

N/A

$912

1.  New permit applications must include the annual fee in addition to the new permit application fee.

 

 

Table 70D

Domestic NPDES and WPCF Annual Population Fee

Population range

Annual fee

500,000+

$96,654

400,000 to 499,999

$73,941

300,000 to 399,999

$51,227

200,000 to 299,999

$28,512

150,000 to 199,999

$23,060

100,000 to 149,999

$15,188

50,000 to 99,999

$9,526

25,000 to 49,999

$4,281

15,000 to 24,999

$2,437

10,000 to 14,999

$1,588

5,000 to 9,999

$966

1,000 to 4,999

$289

100 to 999

$54

0 to 99

$0

 

Table 70E

Annual Pretreatment Fees

Description

Fee

Pretreatment Fee

$1,657

Significant Industrial User

$553 per industry

 

 

 

Table 70F

Technical Activity and Other Fees

Activity

Fee

New or substantially modified sewage treatment facility

$7,623

Minor sewage treatment facility modifications and pump stations

$828

Pressure sewer system or major sewer collection system expansion

$581

Minor sewer collection system expansion or modification

$165

New or substantially modified water pollution control facilities using alkaline agents to stabilize septage

$828

Permit transfer

$82

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 70G

General NPDES and WPCF Permits

Number

Type

Description

New Permit Application Fee1

Annual Fee

100-J

NPDES

Cooling water/heat pumps

$213

$483

200-J

NPDES

Filter backwash

$213

$483

300-J

NPDES

Fish hatcheries

$338

$483

400-J

NPDES

Log ponds

$213

$483

500-J

NPDES

Boiler blowdown

$213

$483

600

WPCF

Offstream small scale mining – processing less than five cubic yards of material per day, or less than 1,500 cubic yards per year

$0

$0

  

Offstream small scale mining – processing 1,500 to10,000 cubic yards of material per year

$213

$0

700-PM2

NPDES

Suction dredges

$0

$25

900-J

NPDES

Seafood processing

$213

$483

1000

WPCF

Gravel mining

$213

$483

1200-A3

NPDES

Stormwater: Sand, gravel, and other non-metallic mining

$826

$850

1200-C3

NPDES

Stormwater: Construction activities – one acre or more

$826

$850

1200-C3

NPDES

Stormwater: Construction activities – less than one acre and part of a common plan of development disturbing one or more acres

$243

$0

1200-CA

NPDES

Stormwater: Construction activities performed by public agencies – one acre or more

$826

$850

1200-COLS3

NPDES

Stormwater: Industrial stormwater discharge to Columbia Slough

$826

$850

1200-Z3,4

NPDES

Stormwater: Industrial

$826

$850

Table 70G

General NPDES and WPCF Permits

Number

Type

Description

New Permit Application Fee1

Annual Fee

1400-A

WPCF

Wineries and seasonal fresh pack operations whose wastewater flow does not exceed 25,000 gallons per day and is only disposed of by land irrigation.

$213

$283

1400-B

WPCF

Wineries and small food processors not otherwise eligible for a 1400A general permit.

$338

$483

1500-A

NPDES

Petroleum hydrocarbon clean-up

$338

$483

1500-B

WPCF

Petroleum hydrocarbon clean-up

$338

$483

1700-A

NPDES

Vehicle and equipment wash water

$471

$483

1700-B

WPCF

Vehicle and equipment wash water

$471

$483

1900-J

NPDES

Non-contact geothermal heat exchange

$471

$483

2401

WPCF

Tier 1 graywater reuse and disposal system for residential systems not exceeding 300 gallons per day, or equivalent specific geographic area graywater reuse and disposal area permit

$50

$40

2402

WPCF

Tier 2 graywater reuse and disposal system for systems not exceeding 1,200 gallons per day, or equivalent specific geographic area graywater reuse and disposal area permit

$534

$50

Other

$471

$483

 

1. New permit applications must include both the new permit application fee and the first year’s annual fee.

2. A person registered under the 700-PM permit may pre-pay $90 for permit coverage through 2014 in lieu of the $25 annual fee.

3. Some of these permits are administered by public agencies under contract with DEQ.

4. This permit incorporates the 1300-J permit.

 

 

 

 

 

 

Table 70H

General Permit Activity and Other Fees

Activity

Fee

Disposal system plan review1

$519

Site inspection and evaluation1

$1,298

Permit Transfer

$82

1.  These fees apply when these activities are required for DEQ’s review of the application.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

340-071-0140

Onsite System Fees

(1) This rule establishes the fees for site evaluations, permits, reports, variances, licenses, and other services the department provides under this division.

(2) Site evaluation and existing system evaluation fees are listed in Table 9A. [Table not included. See ED. NOTE.]

(3) Permitting fees for systems not subject to WPCF permits are listed in Table 9B and Table 9C. [Table not included. See ED. NOTE.]

(4) WPCF permit fees. Fees in this section apply to WPCF permits issued pursuant to OAR 340-071-0162. WPCF permit fees are listed in Table 9D. [Table not included. See ED. NOTE.]

(5) Innovative or Alternative Technology or Material Review fees are listed in Table 9F. [Table not included. See ED. NOTE.]

(6) Material Plan Review fees are listed in Table 9F. [Table not included. See ED. NOTE.]

(7) Sewage Disposal Service License and Truck Inspection fees are listed in Table 9E. [Table not included. See ED. NOTE.]

(8) Contract county fee schedules.

(a) Each county having an agreement with the department under ORS 454.725 must adopt a fee schedule for services rendered and permits issued. The county fee schedule may not include the department's surcharge established in section (9) of this rule unless identified as a department surcharge.

(b) A copy of the fee schedule and any subsequent amendments to the schedule must be submitted to the department.

(c) Fees may not exceed actual costs for efficiently conducted services.

(9) Department surcharge.

(a) To offset a portion of the administrative and program oversight costs of the statewide onsite wastewater management program, the department and contract counties must levy a surcharge for each site evaluation, report permit, and other activity for which an application is required in this division. The surcharge fee is listed in Table 9F. [Table not included. See ED. NOTE.] This surcharge does not apply to sewage disposal service license applications, pumper truck inspections, annual report evaluation fees, or certification of installers or maintenance providers.

(b) Proceeds from surcharges collected by the department and contract counties must be accounted for separately. Each contract county must forward the proceeds to the department in accordance with its agreement with the department.

(10) Refunds. The department may refund all or a portion of a fee accompanying an application if the applicant withdraws the application before any field work or other substantial review of the application has been done.

[ED. NOTE: Tables referenced are not included in rule text. Click here for PDF copy of table(s).]

Stat. Auth.: ORS 454.625, 468.020 & 468.065(2)
Stats. Implemented: ORS 454.745, 468.065 & 468B.050
Hist.: DEQ 10-1981, f. & ef. 3-20-81; DEQ 19-1981, f. 7-23-81, ef. 7-27-81; DEQ 5-1982, f. & ef. 3-9-82; DEQ 8-1983, f. & ef. 5-25-83; DEQ 9-1984, f. & ef. 5-29-84; DEQ 13-1986, f. & ef. 6-18-86; DEQ 15-1986, f. & ef. 8-6-86; DEQ 6-1988, f. & cert. ef. 3-17-88; DEQ 11-1991, f. & cert. ef. 7-3-91; DEQ 18-1994, f. 7-28-94, cert. ef. 8-1-94; DEQ 27-1994, f. & cert. ef. 11-15-94; DEQ 12-1997, f. & cert. ef. 6-19-97; Administrative correction 1-28-98; DEQ 8-1998, f. & cert. ef. 6-5-98; DEQ 16-1999, f. & cert. ef. 12-29-99; Administrative correction 2-16-00; DEQ 9-2001(Temp), f. & cert. ef. 7-16-01 thru 12-28-01; DEQ 14-2001, f. & cert. ef. 12-26-01; DEQ 2-2002, f. & cert. ef. 2-12-02; DEQ 11-2004, f. 12-22-04, cert. ef. 3-1-05; DEQ 7-2008, f. 6-27-08, cert. ef. 7-1-08; DEQ 10-2009, f. 12-28-09, cert. ef. 1-4-10; DEQ 7-2010, f. 8-27-10, cert. ef. 9-1-10; DEQ 9-2011, f. & cert. ef. 6-30-11; DEQ 6-2012, f. f. 10-31-12, cert. ef. 11-1-12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OAR 340-071-0140

 

ONSITE SYSTEM FEE SCHEDULE

 

 

Table 9A

 

Site Evaluation and Existing System Evaluation Fees

New Site Evaluation fees. Fees in this section apply to each system for which site suitability is evaluated.

 

Single family dwelling - First lot

$680

Single family dwelling - Each additional lot evaluated during initial visit

$680

Commercial facility with a design capacity of 1,000 gpd or less

$680

Commercial facility with a design capacity of 1,001-1,500 gpd

$856

Commercial facility with a design capacity of 1,501-2,000 gpd

$1,032

Commercial facility with a design capacity of 2,001-2,500 gpd

$1,208

Commercial facility with a design capacity of 2,501-3,000 gpd

$1,384

Commercial facility with a design capacity of 3,001-3,500 gpd

$1,560

Commercial facility with a design capacity of 3,501-4,000 gpd

$1,736

Commercial facility with a design capacity of 4,001-4,500 gpd

$1,912

Commercial facility with a design capacity of 4,501-5,000 gpd

$2,088

Commercial facility with a design flow greater than 5,000 gpd

$2,304

Site Evaluation Report Review fee

$640

Existing System Evaluation Report fee

$640

 

 

 

 

Table 9B

 

Permitting Fees for Systems Not Subject to WPCF Permits. Effective January 4, 2010 to January 2, 2011

  

 

Gray water waste disposal sumps

 

 

 

Holding tanks

Standard subsurface,

Absorption trenches in saprolite, Evapotranspiration- absorption, Redundant, Seepage trench, Steep slope

Alternative

treatment technologies, Capping fill, Pressurized distribution, Tile dewatering

 

 

Recirculating gravel filter, Sand filter (commercial or residential)

 

Plan Review fees for

commercial facility systems.

Construction-Installation Permit fees.

       

For systems with a design capacity of less than 600 gpd

 

$364

$702

$819

$1,027

$1,235

$0

For systems with a design capacity of 600 gpd but not more than 1,000 gpd

 

 

$364

 

$702

 

$819

 

$1,027

 

$1,235

 

$299

For systems with a design capacity of 1,001-1,500 gpd

 

$442

$780

$897

$1,105

$1,313

$351

For systems with a design capacity of 1,501-2,000 gpd

 

$520

$858

$975

$1,183

$1,391

$403

For systems with a design capacity of 2,001-2,500 gpd

 

$598

$936

$1,053

$1,261

$1,469

$455

Reinspection fee

$100

      

Pump Evaluation fee. For all permits that specify the use of a pump or dosing siphon except for sand filter, Alternative treatment technologies, Recirculating gravel filter, and pressurized distribution systems

 

 

 

$52

      

 

 

 

 

 

Table 9B

 

Permitting fees for systems not subject to WPCF permits. Effective January 3, 2011

  

 

Gray water waste disposal sumps

 

 

 

Holding tanks

Standard subsurface,

Absorption trenches in saprolite, Evapotranspiration- absorption, Redundant, Seepage trench, Steep slope

Alternative

treatment technologies, Capping fill, Pressurized distribution, Tile dewatering

 

 

Recirculating gravel filter, Sand filter (commercial or residential)

 

Plan Review fees for

commercial facility systems.

Construction-Installation Permit fees.

       

For systems with a design capacity of less than 600 gpd

 

$448

$864

$1,008

$1,235

$1,520

$0

For systems with a design capacity of 600 gpd but not more than 1,000 gpd

 

 

$448

 

$864

 

$1,008

 

$1,235

 

$1,520

 

$368

For systems with a design capacity of 1,001-1,500 gpd

 

$544

$960

$1,104

$1,313

$1,660

$432

For systems with a design capacity of 1,501-2,000 gpd

 

$640

$1,056

$1,200

$1,391

$1,712

$496

For systems with a design capacity of 2,001-2,500 gpd

 

$736

$1,152

$1,296

$1,469

$1,808

$560

Reinspection fee

$100

      

Pump Evaluation fee. For all permits that specify the use of a pump or dosing siphon except for sand filter, Alternative treatment technologies, Recirculating gravel filter, and pressurized distribution systems

 

 

 

$64

      

 

 

 

 

Table 9C

 

Other Permitting Fees for Systems Not Subject to WPCF permits. Effective January 4, 2010 to January 2, 2011

  

 

Field Visit required

 

No Field Visit required

Minor Alteration Permit

$215

  

Major Alteration Permit

$449

  

Minor Repair Permit - Single Family Dwelling

$215

  

Major Repair Permit - Single Family Dwelling

$449

  

Minor Repair Permit - Commercial Facility

$377

  

 

Major Repair Permit - Commercial Facility

$819 or the applicable fee in Table 9B,

whichever is lower.

  

Permit Denial Review

$352

  

Permit Transfer, Reinstatement, or Renewal

 

$423

$124

Authorization Notice

 

$507

$130

Authorization Notice Denial Review

$640

  

Renewal of hardship authorization for temporary dwelling

 

$330

$100

Alternative system inspection - Holding tanks

$312

  

Alternative system inspection - Other alternative systems listed in

Table 9B

 

$429

  

Annual report evaluation - Holding tanks

$25

  

Annual report evaluation - Commercial sand filters, recirculating gravel

filters, and alternative treatment technology

 

$50

  

Variance from onsite system rules

$2,080

  

 

 

 

 

Table 9C

 

Other Permitting Fees for Systems Not Subject to WPCF Permits. Effective January 3, 2011

  

 

Field Visit required

 

No Field Visit required

Minor Alteration Permit

$264

  

Major Alteration Permit

$552

  

Minor Repair Permit - Single Family Dwelling

$256

  

Major Repair Permit - Single Family Dwelling

$535

  

Minor Repair Permit - Commercial Facility

$464

  

 

Major Repair Permit - Commercial Facility

$1,008 or the applicable fee in Table 9B, whichever is lower.

  

Permit Denial Review

$352

  

Permit Transfer, Reinstatement, or Renewal

 

$520

$152

Authorization Notice

 

$624

$160

Authorization Notice Denial Review

$640

  

Renewal of hardship authorization for temporary dwelling

 

$330

$100

Alternative system inspection - Holding tanks

$384

  

Alternative system inspection - Other alternative systems listed in

Table 9B

 

$528

  

Annual report evaluation - Holding tanks

$30

  

Annual report evaluation - Commercial sand filters, recirculating gravel

filters, and alternative treatment technology

 

$60

  

Variance from onsite system rules

$2,080

  

 

 

Table 9D

 

WPCF Permit Fees

  

 

 

 

Application filing fee (all

systems)

Permit

processing fees for onsite systems with a design capacity of 1,200 gpd or less.

 

Permit processing fees for onsite systems with a design capacity over 1,200 gpd:

 

 

 

 

 

Plan Review fee.

 

 

 

Annual Compliance Determination fee.

New application

 

 

 

$72

$576

$2,878

  

Permit renewal (involving request for effluent limit modifications)

 

$72

$287

$1,440

  

Permit renewal (without request for effluent limit modifications)

 

$72

$145

$718

  

Permit modification (involving increase in effluent limitations)

 

$72

$287

$1,440

  

Permit modification (not involving an increase in effluent limits)

 

$72

$216

$718

  

For commercial facilities with a design capacity less than 600 gpd

    

$0

 

For commercial facilities with a design capacity of 600 - 1,000 gpd

    

$275

 

For commercial facilities with a design capacity of 1,001 - 1,500 gpd

    

$324

 

For commercial facilities with a design capacity of 1,501 - 2,000 gpd

    

$372

 

For commercial facilities with a design capacity of 2,001 - 2,500 gpd

    

$420

 

For commercial facilities with a design capacity of 2,501 - 3,000 gpd

    

$492

 

For commercial facilities with a design capacity of 3,001 - 3,500 gpd

    

$540

 

For commercial facilities with a design capacity of 3,501 - 4,000 gpd

    

$588

 

For commercial facilities with a design capacity of 4,001 - 4,500 gpd

    

$635

 

For commercial facilities with a design capacity of 4,501 - 5,000 gpd

    

$683

 

Commercial facilities with a design capacity greater than 5,000 gpd

    

$718

 

Single family dwelling

    

$145

 

Onsite sewage lagoon with no discharge

     

$863

Treatment Standard 1 or better systems with design capacities less than 2,500 gpd

     

$360

Treatment Standard 1 or better systems with design capacities of 2,501 - 20,000 gpd

     

$718

Holding tanks, if by the date specified by the department, the owner does not submit

written certification to the department that the holding tank has been operated the previous calendar year in full compliance with the permit or that the previous year's service logs for the holding tanks are not available for inspection by the department

     

 

 

 

$287

Holding tanks, if by the date specified by the department, the owner submits written

certification to the department that the holding tank has been operated the previous calendar year in full compliance with the permit and that the previous year's service

logs for the holding tanks are available for inspection by the department.

 

 

     

 

 

$31

Other systems with design capacities less than 20,000 gpd

     

$360

Other systems with design capacities greater than 20,000 gpd

     

$718

Site Evaluation Confirmation

$504

 

     

 

 

 

 

Table 9E

 

Sewage Disposal Service License and Truck Inspection Fees

New 3-year business license

$355 per year

Renewal of business license

$320 per year

Transfer of or amendments to license

$200

Reinstatement of suspended license

$250

Pumper truck inspections - First vehicle, each inspection

$100

Pumper truck inspections - Each additional vehicle, each inspection

$50

 

 

 

 

Table 9F

 

Other Fees

Innovative or Alternative Technology or Material Review

$1,600

Material Plan Review

$480

Department surcharge.

$60