A | B | |
---|---|---|
1 | 60 | Percent of fee revenue recommended in the Blue Ribbon Committee Report on Key Enhancements to the Oregon Wastewater Permitting Program (August 2004) |
3 | 62 | Percent of fee revenue represented in 2013-15 Governor's Balanced Budget (incl. policy option packages) - information provided by Adam Coutu |
5 | 3 | Percent of fee increase based on 2013-15 Governor's Balanced Budget - information provided by Yongkie Hurd |
7 | 2.9 | Percent of fee increase - adjusted based on BRC recommendation |
8 | (THIS IS THE PERCENT FEE INCREASE TO USE IN THE RULEMAKING.) |
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | U | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | |||||||||||||||||||
2 | FY 2012-2013 Fees | FY 2013-2014 Fees | Fee Increases | ||||||||||||||||
3 | values are correct 2/5/13 | formulas are correct | Multiplier | formulas are correct 2/5/13 | |||||||||||||||
4 | 2/5/2013 | 1.029 | |||||||||||||||||
5 | Application Fees | ||||||||||||||||||
6 | Class | New Permit Application Fee | Modification at Permit Renewal Major Modification | Major Modification Prior to Permit Expiration | Minor Modification | Permit Transfer | New Permit Application Fee | Modification at Permit Renewal Major Modification | Major Modification Prior to Permit Expiration | Minor Modification | Permit Transfer | New Permit Application Fee | Modification at Permit Renewal Major Modification | Major Modification Prior to Permit Expiration | Minor Modification | Permit Transfer | |||
7 | Tier 1 | $50,642 | $12,722 | $25,282 | $886 | 80 | $52,111 | $13,091 | $26,015 | $912 | $82 | $1,469 | $369 | $733 | $26 | $2 | Min App. Fee Increase: | $14 | |
8 | Tier 2 | $10,191 | $3,234 | $5,052 | $886 | 80 | $10,487 | $3,328 | $5,199 | $912 | $82 | $296 | $94 | $147 | $26 | $2 | Max App. Fee Increase: | $1,469 | |
9 | Special WPCF Permits issued pursuant to OAR 340-045-0061 | $483 | N/A | N/A | N/A | 80 | $497 | N/A | N/A | N/A | $82 | $14 | $2 | ||||||
11 | Annual Fees | ||||||||||||||||||
12 | Type | Description | NPDES Tier 1 | NPDES Tier 2 | WPCF Tier 1 | WPCF Tier 2 | NPDES Tier 1 | NPDES Tier 2 | WPCF Tier 1 | WPCF Tier 2 | NPDES Tier 1 | NPDES Tier 2 | WPCF Tier 1 | WPCF Tier 2 | |||||
13 | B01 | Pulp, paper, and other fiber pulping industry. | $17,708 | N/A | $16,435 | N/A | $18,222 | N/A | $16,912 | N/A | $514 | $477 | Min. Annual Fee Increase: | $39 | |||||
14 | Food/beverage processing - includes produce, meat, poultry, seafood, dairy for human/pet/livestock consumption. | Max. Annual Fee Increase: | $514 | ||||||||||||||||
15 | B02 | Washing/Packing only | N/A | $2,462 | N/A | 2264 | N/A | $2,533 | N/A | $2,330 | $71 | $66 | |||||||
16 | B03 | Processing – small. Flow ≤ 0.1 MGD | N/A | $3,680 | N/A | 3482 | N/A | $3,787 | N/A | $3,583 | $107 | $101 | |||||||
17 | B04 | Processing – medium. 0.1 MGD < Flow < 1 MGD | N/A | $5,193 | N/A | 4995 | N/A | $5,344 | N/A | $5,140 | $151 | $145 | |||||||
18 | B05 | Processing – large and complex. Flow ≥ 1 MGD | $17,708 | $15,560 | $16,435 | 15360 | $18,222 | $16,011 | $16,912 | $15,805 | $514 | $451 | $477 | $445 | |||||
19 | Primary aluminum smelting and/or refining | ||||||||||||||||||
20 | B06 | Aluminum | $17,708 | $15,560 | $16,435 | 15360 | $18,222 | $16,011 | $16,912 | $15,805 | $514 | $451 | $477 | $445 | |||||
21 | B07 | Non-ferrous metals utilizing sand chlorination separation facilities | $17,708 | $15,560 | $16,435 | 15360 | $18,222 | $16,011 | $16,912 | $15,805 | $514 | $451 | $477 | $445 | |||||
22 | B08 | Ferrous and non-ferrous metals not elsewhere classified above | $10,127 | $7,977 | $8,854 | 7780 | $10,421 | $8,208 | $9,111 | $8,006 | $294 | $231 | $257 | $226 | |||||
23 | B09 | Chemical manufacturing with discharge of process wastewater | $17,708 | $15,560 | $16,435 | 15360 | $18,222 | $16,011 | $16,912 | $15,805 | $514 | $451 | $477 | $445 | |||||
24 | B10 | Cooling water discharges in excess of 20,000 BTU/sec | $10,127 | $7,977 | $8,854 | 7780 | $10,421 | $8,208 | $9,111 | $8,006 | $294 | $231 | $257 | $226 | |||||
25 | Mining Operations – includes aggregate/ore processing | ||||||||||||||||||
26 | B11 | Large (over 500,000 cubic yards per year and/or involving chemical leaching) | $17,708 | $15,560 | $16,435 | 15360 | $18,222 | $16,011 | $16,912 | $15,805 | $514 | $451 | $477 | $445 | |||||
27 | B12 | Medium (100,000 to 500,000 cubic yards per year) | N/A | $5,447 | N/A | 5249 | N/A | $5,605 | N/A | $5,401 | $158 | $152 | |||||||
28 | B13 | Small - small (less than 100,000 cubic yards per year) | N/A | $1,658 | N/A | 1460 | N/A | $1,706 | N/A | $1,502 | $48 | $42 | |||||||
29 | All facilities not elsewhere classified which dispose of process wastewater (includes remediated groundwater) | ||||||||||||||||||
30 | B14 | Tier 1 sources | $17,708 | N/A | $16,435 | N/A | $18,222 | N/A | $16,912 | N/A | $514 | $477 | |||||||
31 | B15 | Tier 2 sources | N/A | $3,427 | N/A | 3231 | N/A | $3,526 | N/A | $3,325 | $99 | $94 | |||||||
32 | B16 | All facilities not elsewhere classified which dispose of non-process wastewaters (i.e., small cooling water discharges, boiler blowdown, filter backwash, log ponds, etc). | N/A | $2,294 | N/A | 2096 | N/A | $2,361 | N/A | $2,157 | $67 | $61 | |||||||
33 | B17 | Dairies, fish hatcheries and other confined feeding operations on individual permits | N/A | $2,008 | N/A | 1811 | N/A | $2,066 | N/A | $1,864 | $58 | $53 | |||||||
34 | B18 | All facilities which dispose of wastewaters only by evaporation from watertight ponds or basins | N/A | N/A | N/A | 1331 | N/A | N/A | N/A | $1,370 | $39 | ||||||||
35 | Timber and Wood Products | ||||||||||||||||||
36 | B19 | Sawmills, log storage, instream log storage. | $4,967 | $2,818 | $3,695 | 2619 | $5,111 | $2,900 | $3,802 | $2,695 | $144 | $82 | $107 | $76 | |||||
37 | B20 | Hardboard, veneer, plywood, particle board, pressboard manufacturing, wood products. | $5,252 | $3,104 | $3,981 | 2907 | $5,404 | $3,194 | $4,096 | $2,991 | $152 | $90 | $115 | $84 | |||||
38 | B21 | Wood preserving | $4,444 | $2,294 | $3,171 | 2096 | $4,573 | $2,361 | $3,263 | $2,157 | $129 | $67 | $92 | $61 |
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | U | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | |||||||||||||||||||
2 | FY 2012-2013 Fees | FY 2013-2014 Fees | Multiplier | Fee Increases | |||||||||||||||
3 | values are correct 2/5/13 | formulas are correct 2/5/13 | 1.029 | formulas are correct 2/5/13 | |||||||||||||||
4 | Type of Treatment System | Type | Average Dry Weather Design Flow | New Permit Application Fee | Base Annual Fee, 5 year permits | Base Annual Fee, 10 year permits | Major Modification | Minor Modification | New Permit Application Fee | Base Annual Fee, 5 year permits | Base Annual Fee, 10 year permits | Major Modification | Minor Modification | New Permit Application Fee | Base Annual Fee, 5 year permits | Base Annual Fee, 10 year permits | Major Modification | Minor Modification | |
5 | Nondischarging lagoons | E | N/A | $3,302 | N/A | $1,054 | $1,691 | $886 | $3,398 | N/A | $1,085 | $1,740 | $912 | $96 | $31 | $49 | $26 | ||
6 | Lagoons that discharge to surface waters | Db | Flow < 1 mgd | $6,521 | $1,264 | N/A | $3,302 | $886 | $6,710 | $1,301 | N/A | $3,398 | $912 | $189 | $37 | $96 | $26 | ||
7 | C2b | 1 mgd ≤ Flow < 2 mgd | $32,285 | $3,332 | N/A | $16,182 | $886 | $33,221 | $3,429 | N/A | $16,651 | $912 | $936 | $97 | $469 | $26 | |||
8 | C1b | 2 mgd ≤ Flow < 5 mgd | $32,285 | $4,566 | N/A | $16,182 | $886 | $33,221 | $4,698 | N/A | $16,651 | $912 | $936 | $132 | $469 | $26 | |||
9 | Bb | 5 mgd ≤ Flow < 10 mgd | $32,285 | $6,565 | N/A | $16,182 | $886 | $33,221 | $6,755 | N/A | $16,651 | $912 | $936 | $190 | $469 | $26 | |||
10 | Treatment systems other than lagoons | Da | Flow < 1 mgd | $6,521 | $1,794 | $1,665 | $3,302 | $886 | $6,710 | $1,846 | $1,713 | $3,398 | $912 | $189 | $52 | $48 | $96 | $26 | |
11 | C2a | 1 mgd ≤ Flow < 2 mgd | $32,285 | $5,666 | $4,853 | $16,182 | $886 | $33,221 | $5,830 | $4,994 | $16,651 | $912 | $936 | $164 | $141 | $469 | $26 | ||
12 | C1a | 2 mgd ≤ Flow < 5 mgd | $32,285 | $8,348 | $7,536 | $16,182 | $886 | $33,221 | $8,590 | $7,755 | $16,651 | $912 | $936 | $242 | $219 | $469 | $26 | ||
13 | Ba | 5 mgd ≤ Flow < 10 mgd | $32,285 | $12,415 | $11,603 | $16,182 | $886 | $33,221 | $12,775 | $11,939 | $16,651 | $912 | $936 | $360 | $336 | $469 | $26 | ||
14 | A3 | 10 mgd ≤ Flow < 25 mgd | $32,285 | $19,366 | N/A | $16,182 | $886 | $33,221 | $19,928 | N/A | $16,651 | $912 | $936 | $562 | $469 | $26 | |||
15 | A2 | 25 mgd ≤ Flow < 50 mgd | $32,285 | $41,090 | N/A | $16,182 | $886 | $33,221 | $42,282 | N/A | $16,651 | $912 | $936 | $1,192 | $469 | $26 | |||
16 | A1 | ≥ 50 mgd | $32,285 | $69,915 | N/A | $16,182 | $886 | $33,221 | $71,943 | N/A | $16,651 | $912 | $936 | $2,028 | $469 | $26 | |||
17 | Septage alkaline stabilization facilities | F | N/A | $886 | N/A | $363 | N/A | $402 | $912 | N/A | $374 | N/A | $414 | $26 | $11 | $12 | |||
18 | Municipal Stormwater Permits | MS4 Phase I | N/A | $17,929 | $4,036 | N/A | N/A | $1,558 | $18,449 | $4,153 | N/A | $8,982 | $1,603 | $520 | $117 | $45 | |||
19 | MS4 Phase II | N/A | $803 | $826 | N/A | N/A | $1,558 | $826 | $850 | N/A | N/A | $1,603 | $23 | $24 | $45 | ||||
20 | UIC | N/A | $10,191 | N/A | $2,096 | N/A | $886 | $10,487 | N/A | $2,157 | $5,106 | $912 | $296 | $61 | $26 | ||||
52 | Minimum Application Fee Increase | $23 | Maximum Application Fee Increase | $936 | |||||||||||||||
53 | Minimum Annual Fee Increase | $11 | Maximum Annual Fee Increase | $2,028 |
A | B | C | D | E | H | |
---|---|---|---|---|---|---|
1 | Municipal Permit Fees | Multiplier | ||||
2 | 1.029 | |||||
3 | Annual Population Fee: | FY 2012-2013 Fees | FY 2013-2014 Fees | Fee Increases | ||
4 | values are correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | |||
5 | Population range | Annual fee | Annual fee | Annual fee | ||
6 | 500,000+ | $93,930 | $96,654 | $2,724 | Minimum Annual Fee Increase | $2 |
7 | 400,000 to 499,999 | $71,857 | $73,941 | $2,084 | Maximum Annual Fee Increase | $2,724 |
8 | 300,000 to 399,999 | $49,783 | $51,227 | $1,444 | ||
9 | 200,000 to 299,999 | $27,708 | $28,512 | $804 | ||
10 | 150,000 to 199,999 | $22,410 | $23,060 | $650 | ||
11 | 100,000 to 149,999 | $14,760 | $15,188 | $428 | ||
12 | 50,000 to 99,999 | $9,258 | $9,526 | $268 | ||
13 | 25,000 to 49,999 | $4,160 | $4,281 | $121 | ||
14 | 15,000 to 24,999 | $2,368 | $2,437 | $69 | ||
15 | 10,000 to 14,999 | $1,543 | $1,588 | $45 | ||
16 | 5,000 to 9,999 | $939 | $966 | $27 | ||
17 | 1,000 to 4,999 | $281 | $289 | $8 | ||
18 | 100 to 999 | $52 | $54 | $2 | ||
19 | 0 to 99 | $0 | $0 | $0 | ||
21 | Annual Pretreatment Fees: | values are correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | ||
22 | FY 2012-2013 Fees | FY 2013-2014 Fees | Fee Increases | |||
23 | Pretreatment Fee | $1,610 | $1,657 | $47 | Minimum Annual Fee Increase | $16 |
24 | SIU Fee, per industry | $537 | $553 | $16 | Maximum Annual Fee Increase | $47 |
27 | Technical Activity and Other Fees: | values are correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | ||
28 | FY 2012-2013 Fees | FY 2013-2014 Fees | Fee Increases | |||
29 | Activity | Fee | Fee | Fee | ||
30 | New or substantially modified sewage treatment facility: | $7,408 | $7,623 | $215 | ||
31 | Minor sewage treatment facility modifications and pump stations: | $805 | $828 | $23 | ||
32 | Pressure sewer system or major sewer collection system expansion: | $565 | $581 | $16 | ||
33 | Minor sewer collection system expansion or modification: | $160 | $165 | $5 | ||
34 | New or substantially modified water pollution control facilities using alkaline agents to stabilize septage: | $805 | $828 | $23 | ||
35 | Permit Transfer | $80 | $82 | $2 |
A | B | C | D | E | F | G | H | I | J | K | L | M | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | values correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | ||||||||||
2 | FY 2012-2013 Fees | FY 2013-2014 Fees | Fee Increases | ||||||||||
3 | |||||||||||||
4 | Disposal system plan review | $504 | $519 | Multiplier | $15 | ||||||||
5 | Site inspection and evaluation | $1,261 | $1,298 | 1.029 | $37 | ||||||||
6 | Permit Transfer | $80 | $82 | $2 | |||||||||
8 | correct 2/5/13 | correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | formula correct 2/5/13 | |||||||
9 | No. | Description | New Permit Application Fee | Annual Fee | New Permit Application Fee | Annual Fee | New Permit Application Fee | Annual Fee | |||||
10 | 100-J | NPDES | Cooling water/heat pumps | $207 | $469 | $213 | $483 | $6 | $14 | Minimum Application Fee Increase: | $6 | ||
11 | 200-J | NPDES | Filter Backwash | $207 | $469 | $213 | $483 | $6 | $14 | Maximum Application Fee Increase: | $23 | ||
12 | 300-J | NPDES | Fish Hatcheries | $328 | $469 | $338 | $483 | $10 | $14 | Minimum Annual Fee Increase: | $8 | ||
13 | 400-J | NPDES | Log Ponds | $207 | $469 | $213 | $483 | $6 | $14 | Maximum Annual Fee Increase: | $24 | ||
14 | 500-J | NPDES | Boiler blowdown | $207 | $469 | $213 | $483 | $6 | $14 | ||||
15 | 600 | WPCF | Offstream placer mining – processing less than 5 cubic yards of material per day, or less than 1500 cubic yards per year. | $0 | $0 | $0 | $0 | $0 | $0 | ||||
16 | Offstream placer mining – processing 1,500 cubic yards or more of material per year. | $207 | $0 | $213 | $0 | $6 | $0 | ||||||
17 | 700-PM | NPDES | Suction dredges – 4 inches or greater in diameter. | $0 | $25 | $0 | $25 | $0 | $0 | ||||
18 | 900-J | NPDES | Seafood processing | $207 | $469 | $213 | $483 | $6 | $14 | ||||
19 | 1000 | WPCF | Gravel mining | $207 | $469 | $213 | $483 | $6 | $14 | ||||
20 | 1200A | NPDES | Storm Water: Sand, gravel, and other non-metallic mining (SIC 14) | $803 | $826 | $826 | $850 | $23 | $24 | ||||
21 | 1200C | NPDES | Storm Water: Construction activities – 1 acre or more | $803 | $826 | $826 | $850 | $23 | $24 | Increased cost for a new house = application fee plus first year fee for 1200C less than one acre (and part of common plan of development) | |||
22 | 1200C | NPDES | Storm Water: Construction activities – less than 1 acre | $236 | $0 | $243 | $0 | $7 | $0 | old | new | ||
23 | 1200CA | NPDES | Storm Water: Construction activities performed by public agencies – 1 acre or more | $803 | $826 | $826 | $850 | $23 | $24 | $236 | $243 | ||
24 | 1200COLS | NPDES | Stormwater: industrial stormwater discharge to Columbia Slough | $803 | $826 | $826 | $850 | $23 | $24 | (6000 square foot parcel = 0.14 acre) | |||
25 | 1200Z | NPDES | Stormwater: Industrial | $803 | $826 | $826 | $850 | $23 | $24 | ||||
26 | 1400A | WPCF | Wineries and seasonal fresh pack operations whose wastewater flow does not exceed 25,000 gallons per day and is only dis posed of by land irrigation. | $207 | $275 | $213 | $283 | $6 | $8 | ||||
27 | 1400B | WPCF | Wineries and small food processors not eligible for a 1400A general permit. | $328 | $469 | $338 | $483 | $10 | $14 | ||||
28 | 1500A | NPDES | Petroleum hydrocarbon clean-up | $328 | $469 | $338 | $483 | $10 | $14 | ||||
29 | 1500B | WPCF | Petroleum hydrocarbon clean-up | $328 | $469 | $338 | $483 | $10 | $14 | ||||
30 | 1700A | NPDES | Vehicle & equipment wash water | $458 | $469 | $471 | $483 | $13 | $14 | ||||
31 | 1700B | WPCF | Vehicle & equipment wash water | $458 | $469 | $471 | $483 | $13 | $14 | ||||
32 | 1900 | NPDES | Non-contact geothermal heat exchange | $458 | $469 | $471 | $483 | $13 | $14 | ||||
33 | 2401 | WPCF | Tier 1 graywater reuse and disposal system for residential systems not exceeding 300 gallons per day, or equivalent specific geographic area graywater reuse and disposal area permit | $50 | $40 | $50 | $40 | $0 | $0 | ||||
34 | 2402 | WPCF | Tier 2 graywater reuse and disposal system for systems not exceeding 1,200 gallons per day, or equivalent specific geographic area graywater reuse and disposal area permit | $534 | $50 | $534 | $50 | $0 | $0 | ||||
35 | Other | $458 | $469 | $471 | $483 | $13 | $14 |
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | FY 2012-2013 Permit Fees | FY 2013-2014 Permit Fees | formulas correct 2/5/23 | Fee Increases | formulas correct 2/5/13 | ||||||||||||||
2 | values are correct 2/5/13 | Multiplier | 1.029 | ||||||||||||||||
3 | Table 9D: WPCF permit fees. | ||||||||||||||||||
4 | Application filing fee (all systems) | Permit processing fees for onsite systems with a design capacity of 1,200 gpd or less | Permit processing fees for onsite systems with a design capacity over 1,200 gpd | Plan review fee | Annual compliance determination fee | Application filing fee (all systems) | Permit processing fees for onsite systems with a design capacity of 1,200 gpd or less | Permit processing fees for onsite systems with a design capacity over 1,200 gpd | Plan review fee | Annual compliance determination fee | Application filing fee (all systems) | Permit processing fees for onsite systems with a design capacity of 1,200 gpd or less | Permit processing fees for onsite systems with a design capacity over 1,200 gpd | Plan review fee | Annual compliance determination fee | ||||
5 | New application | $70 | $560 | $2,797 | $72 | $576 | $2,878 | $2 | $16 | $81 | |||||||||
6 | Permit renewal (involving request for effluent limit modifications) | $70 | $279 | $1,399 | $72 | $287 | $1,440 | $2 | $8 | $41 | |||||||||
7 | Permit renewal (without request for effluent limit modifications) | $70 | $141 | $698 | $72 | $145 | $718 | $2 | $4 | $20 | |||||||||
8 | Permit modification (involving increase in effluent limitations) | $70 | $279 | $1,399 | $72 | $287 | $1,440 | $2 | $8 | $41 | |||||||||
9 | Permit modification (not involving an increase in effluent limits) | $70 | $210 | $698 | $72 | $216 | $718 | $2 | $6 | $20 | |||||||||
10 | For commercial facilities with a design capacity less than 600 gpd | $0 | $0 | $0 | |||||||||||||||
11 | For commercial facilities with a design capacity of 600 - 1,000 gpd | $267 | $275 | $8 | |||||||||||||||
12 | For commercial facilities with a design capacity of 1,001 - 1,500 gpd | $315 | $324 | $9 | |||||||||||||||
13 | For commercial facilities with a design capacity of 1,501 - 2,000 gpd | $362 | $372 | $10 | |||||||||||||||
14 | For commercial facilities with a design capacity of 2,001 - 2,500 gpd | $408 | $420 | $12 | |||||||||||||||
15 | For commercial facilities with a design capacity of 2,501 - 3,000 gpd | $478 | $492 | $14 | |||||||||||||||
16 | For commercial facilities with a design capacity of 3,001 - 3,500 gpd | $525 | $540 | $15 | |||||||||||||||
17 | For commercial facilities with a design capacity of 3,501 - 4,000 gpd | $571 | $588 | $17 | |||||||||||||||
18 | For commercial facilities with a design capacity of 4,001 - 4,500 gpd | $617 | $635 | $18 | |||||||||||||||
19 | For commercial facilities with a design capacity of 4,501 - 5,000 gpd | $664 | $683 | $19 | |||||||||||||||
20 | Commercial facilities with a design capacity greater than 5,000 gpd | $698 | $718 | $20 | |||||||||||||||
21 | Single family dwelling | $141 | $145 | $4 | |||||||||||||||
22 | Onsite sewage lagoon with no discharge | $839 | $863 | $24 | |||||||||||||||
23 | Treatment Standard 1 or better systems with design capacities less than 2,500 gpd | $350 | $360 | $10 | |||||||||||||||
24 | Treatment Standard 1 or better systems with design capacities of 2,501 - 20,000 gpd | $698 | $718 | $20 | |||||||||||||||
25 | Holding tanks, if by the date specified by the department, the owner does not submit written certification to the department that the holding tank has been operated the previous calendar year in full compliance with the permit or that the previous year's service logs for the holding tanks are not available for inspection by the department. | $279 | $287 | $8 | |||||||||||||||
26 | Holding tanks, if by the date specified by the department, the owner submits written certification to the department that the holding tank has been operated the previous calendar year in full compliance with the permit and that the previous year's service | $30 | $31 | $1 | |||||||||||||||
27 | Other systems with design capacities less than 20,000 gpd | $350 | $360 | $10 | |||||||||||||||
28 | Other systems with design capacities greater than 20,000 gpd | $698 | $718 | $20 | |||||||||||||||
29 | Site Evaluation Confirmation | $490 | $504 | $14 | |||||||||||||||
31 | Tables 9D covers fees relating to WPCF Onsite permits, also known as WPCFOS permits. This table is referenced in OAR 340-071-0140. WPCFOS permits are WPCF permits for septic systems. They are distinguished from ordinary residential septic system permits which are issued under ORS 454 in that they meet at least one of the following three criteria: 1. They are large (>2500 gallons per day), 2. They are designed to treat high strength wastewater (defined as stronger than that associated with residential systems, as defined in Division 71), 3. They involve treatment systems or disposal methods that are not described in Division 71. |