340-045-0075
Permit Fee Schedule
(1) The fee schedule for onsite sewage disposal system permits, including WPCF permits, and graywater reuse and disposal system WPCF individual permits is found in OAR chapter 340, division 071.
(2) The department has established fees for various industrial, domestic and general permit categories. The industrial and domestic permit categories and fees are listed in Tables 70B and 70C. The general permit categories are defined in OAR 340-045-0033 and the fees are listed in Table 70G.
(3) The department must consider the following criteria when classifying a facility for determining applicable fees. For industrial sources that discharge to surface waters, discharge flowrate refers to the system design capacity. For industrial sources that do not discharge to surface waters, discharge flow refers to the total annual flow divided by 365:
(a) Tier 1 industry. A facility is classified as a Tier 1 industry if the facility:
(A) Discharges at a flowrate that is greater than or equal to 1 mgd; or
(B) Discharges large biochemical oxygen demand loads; or
(C) Is a large metals facility; or
(D) Has significant toxic discharges; or
(E) Has a treatment system that will have a significant adverse impact on the receiving stream if not operated properly; or
(F) Needs special regulatory control, as determined by the department.
(b) Tier 1 domestic facility. A facility is classified as a Tier 1 domestic facility if the facility:
(A) Has a dry weather design flow of 1 mgd or greater; or
(B) Serves an industry that can have a significant impact on the treatment system.
(c) Tier 2 industry or domestic facility: does not meet Tier 1 qualifying factors.
(4) New-permit application fee. Unless waived by this rule, the applicable new-permit application fee listed in Table 70A, 70C or 70G (available on the department's website or upon request) must be submitted with each application. The amount of the fee is based on the facility category and type of permit (e.g., individual vs. general).
(5) Permit modification fee. Permit modification fees are listed in Tables 70A and 70C (available on the department's website or upon request). They vary with the type of permit, the type of modification and the timing of modification as follows:
(a) Modification at time of permit renewal:
(A) Major modification — involves an increase in effluent limitations or any other change that involves significant analysis by the department;
(B) Minor modification — does not involve significant analysis by the department.
(b) Modification prior to permit renewal:
(A) Major modification — involves an increase in effluent limitations or any other change that involves significant analysis by the department. A permittee requesting a significant modification to their permit may be required by the department to enter into an agreement to pay for these services according to ORS 468.073. ORS 468.073 allows the department "to expedite or enhance a regulatory process by contracting for services, hiring additional staff or covering costs of activities not otherwise provided during the ordinary course of department business;"
(B) Minor modification — does not involve significant analysis by the department.
(6) Annual fees. Applicable annual fees for General and Industrial permit holders may be found in Tables 70G and 70B (available on the department's website or upon request). Annual fees for domestic sources may also be found in Table 70C (available on the department's website or upon request), and consist of the following:
(a) Base annual fee. This is based on the type of treatment system and the dry weather design flow;
(b) Population-based fee. A permit holder with treatment systems other than Type F (septage alkaline stabilization facilities) must pay a population-based fee. The applicable fee may be found in Table 70D (available on the department's website or upon request);
(c) Pretreatment fee. A source required by the department to administer a pretreatment program pursuant to federal pretreatment program regulations (40CFR, Part 403; January 29, 1981 and amendments thereto) must pay an additional annual fee plus a fee for each significant industrial user specified in their annual report for the previous year. The applicable fee may be found in Table 70E (available on the department's website or upon request).
(7) Technical activities fee. Technical activity fees are listed in Tables 70F and 70H (available on the department's website or upon request). They are categorized as follows:
(a) All permits. A permittee must pay a fee for NPDES and WPCF permit-related technical activities. A fee will be charged for initial submittal of engineering plans and specifications. Fees will not be charged for revisions and re-submittals of engineering plans and specifications or for facilities plans, design studies, reports, change orders, or inspections;
(b) General permits. A permittee must pay the technical activity fee shown in Table 70H (available on the department's website or upon request) when the following activities are required for application review:
(A) Disposal system plan review;
(B) Site inspection and evaluation.
(8) For permits administered by the Oregon Department of Agriculture, the following fees are applicable until superseded by a fee schedule established by the Oregon Department of Agriculture:
(a) WPCF and NPDES General Permits #800 for Confined Animal Feeding Operations Filing Fee — $50;
(b) Individual Permits:
(A) Filing Fee — $50;
(B) New applications — $6,280;
(C) Permit renewals (including request for effluent limit modifications) — $3,140;
(D) Permit renewals (without request for effluent limit modifications) — $1,416;
(E) Permit modifications (involving increase in effluent limit modifications) — $3,140;
(F) Permit modifications (not involving an increase in effluent limitations) — $500;
(G) Annual compliance determination fee for dairies and other confined feeding operations — $705;
(H) Annual compliance determination fee for facilities not elsewhere classified with disposal of process wastewater — $1,885;
(I) Annual compliance determination fee for facilities not elsewhere classified that dispose of non-process wastewater (e.g., small cooling water discharges, boiler blowdown, filter backwash, log ponds) — $1,180.
(c) Annual compliance determination fee for facilities that dispose of wastewater only by evaporation from watertight ponds or basins — $705.
(9) A surcharge in the amount listed below is imposed on municipalities that are permittees as defined in 2007 Oregon Laws chapter 696, section 2. The surcharge is imposed to defray the cost of conducting and administering the study of persistent pollutants discharged in the State of Oregon required under 2007 Oregon Laws chapter 696, section 3. A permittee subject to the surcharge must pay one half of the surcharge on or before July 15, 2008 and the other half of the surcharge on or before July 15, 2009.
Each municipality will pay a surcharge based on a dry weather design flow in millions of gallons per day (mgd) as follows:
less than 5 mgd = $6,975.
5 mgd to 9.9 mgd = $13,950.
10 mgd and greater = $20,925.
[ED. NOTE: Tables referenced are not included in rule text. Click here for PDF copy of table(s).]
Stat. Auth.: ORS 468.020, 468B.020 & 468B.035
Stats. Implemented: ORS 468.065, 468B.015, 468B.035 & 468B.050
Hist.: DEQ 113, f. & ef. 5-10-76; DEQ 129, f. & ef. 3-16-77; DEQ 31-1979, f. & ef. 10-1-79; DEQ 18-1981, f. & ef. 7-13-81; DEQ 12-1983, f. & ef. 6-2-83; DEQ 9-1987, f. & ef. 6-3-87; DEQ 18-1990, f. & cert. ef. 6-7-90; DEQ 10-1991, f. & cert. ef. 7-1-91; DEQ 9-1992, f. & cert. ef. 6-5-92; DEQ 10-1992, f. & cert. ef. 6-9-92; DEQ 30-1992, f. & cert. ef. 12-18-92; DEQ 20-1994, f. & cert. ef. 10-7-94; DEQ 4-1998, f. & cert. ef. 3-30-98; Administrative correction 10-22-98; DEQ 15-2000, f. & cert. ef. 10-11-00; DEQ 2-2002, f. & cert. ef. 2-12-02; DEQ 7-2004, f. & cert. ef. 8-3-04; DEQ 5-2005, f. & cert. ef. 7-1-05; DEQ 11-2006, f. & cert. ef. 8-15-06; DEQ 5-2007, f. & cert. ef. 7-3-07; DEQ 8-2008, f. 6-27-08, cert. ef. 7-1-08; DEQ 7-2010, f. 8-27-10, cert. ef. 9-1-10; DEQ 9-2011, f. & cert. ef. 6-30-11; DEQ 15-2011, f. & cert. ef. 9-12-11; DEQ 6-2012, f. f. 10-31-12, cert. ef. 11-1-12
OAR 340-045-0075
Permit Fee Schedule
Table 70A Industrial NPDES and WPCF Individual Permit Application and Modification Fees |
DEQ Class | New Permit Application Fee1 | Major Modification at Permit Renewal | Major Modification Prior to Permit Expiration | Minor Modification | Permit Transfer |
Tier 1 | $52,111 | $13,091 | $26,015 | $912 | $82 |
Tier 2 | $10,487 | $3,328 | $5,199 | $912 | $82 |
Special WPCF permits issued pursuant to OAR 340-045-0061 | $497 | N/A | N/A | N/A | $82 |
1. New permit applications must include the annual fee specified in Table 70B in addition to the new permit application fee.
Table 70B Industrial NPDES and WPCF Individual Permit Annual Fees |
Type | Description | NPDES Tier 1 | NPDES Tier 2 | WPCF Tier 1 | WPCF Tier 2 |
B01 | Pulp, paper, or other fiber pulping industry | $18,222 | N/A | $16,912 | N/A |
Food or beverage processing - includes produce, meat, poultry, seafood or dairy for human, pet, or livestock consumption |
B02 | Washing or packing only | N/A | $2,533 | N/A | $2,330 |
B03 | Processing – small. Flow ≤ 0.1 mgd, or 0.1 < flow < 1 mgd for less than 180 days per year | N/A | $3,787 | N/A | $3,583 |
B04 | Processing – medium. 0.1 mgd < Flow < 1 mgd for 180 or more days per year, or flow ≥ 1 mgd for less than 180 days per year | N/A | $5,344 | N/A | $5,140 |
B05 | Processing – large. Flow ≥ 1 mgd for 180 or more days per year | $18,222 | $16,011 | $16,912 | $15,805 |
Primary Smelting or Refining |
B06 | Aluminum | $18,222 | $16,011 | $16,912 | $15,805 |
B07 | Non-ferrous metals utilizing sand chlorination separation facilities | $18,222 | $16,011 | $16,912 | $15,805 |
B08 | Ferrous and non-ferrous metals not elsewhere classified | $10,421 | $8,208 | $9,111 | $8,006 |
B09 | Chemical manufacturing with discharge of process wastewater | $18,222 | $16,011 | $16,912 | $15,805 |
B10 | Cooling water discharges in excess of 20,000 BTU per second | $10,421 | $8,208 | $9,111 | $8,006 |
Mining Operations – includes aggregate or ore processing |
B11 | Large (over 500,000 cubic yards per year or involving chemical leaching) | $18,222 | $16,011 | $16,912 | $15,805 |
B12 | Medium (100,000 to 500,000 cubic yards per year) | N/A | $5,605 | N/A | $5,401 |
B13 | Small (less than 100,000 cubic yards per year) | N/A | $1,706 | N/A | $1,502 |
All facilities not elsewhere classified which dispose of process wastewater (includes remediated groundwater) |
B14 | Tier 1 sources | $18,222 | N/A | $16,912 | N/A |
B15 |
Tier 2 sources | N/A | $3,526 | N/A | $3,325 |
B16 | All facilities not elsewhere classified which dispose of non-process wastewaters (for example: small cooling water discharges, boiler blowdown, filter backwash) | N/A | $2,361 | N/A | $2,157 |
B17 | Dairies, fish hatcheries and other confined feeding operations on individual permits | N/A | $2,066 | N/A | $1,864 |
B18 | All facilities which dispose of wastewater only by evaporation from watertight ponds or basins | N/A | N/A | N/A | $1,370 |
Timber and Wood Products |
B19 | Sawmills, log storage, instream log storage | $5,111 | $2,900 | $3,802 | $2,695 |
B20 | Hardboard, veneer, plywood, particle board, pressboard manufacturing, wood products | $5,404 | $3,194 | $4,096 | $2,991 |
B21 | Wood preserving | $4,573 | $2,361 | $3,263 | $2,157 |
Table 70C Domestic NPDES and WPCF Individual Permits |
Description | Type | Classification Criteria (Based on Average Dry Weather Design Flow, or as defined in 40CFR) | Class | New Permit App.Fee1 | Base Annual Fee, 5 year permits | Base Annual Fee, 10 year permits | Additional Annual Fees | Major Modification | Minor Modification |
Nondischarging lagoons | E | N/A | Tier 2 | $3,398 | N/A | $1,085 | Additional fees include population and pretreatment fees. See tables 70D and 70E for determination of these fees. | $1,740 | $912 |
Lagoons that discharge to surface waters | Db | Flow < 1 mgd | Tier 2 | $6,710 | $1,301 | N/A | $3,398 | $912 |
C2b | 1 mgd ≤ Flow < 2 mgd | Tier 1 | $33,221 | $3,429 | N/A | $16,651 | $912 |
C1b | 2 mgd ≤ Flow < 5 mgd | Tier 1 | $33,221 | $4,698 | N/A | $16,651 | $912 |
Bb | 5 mgd ≤ Flow < 10 mgd | Tier 1 | $33,221 | $6,755 | N/A | $16,651 | $912 |
Treatment systems other than lagoons
| Da | Flow < 1 mgd | Tier 2 | $6,710 | $1,846 | $1,713 | $3,398 | $912 |
C2a | 1 mgd ≤ Flow < 2 mgd | Tier 1 | $33,221 | $5,830 | $4,994 | $16,651 | $912 |
C1a | 2 mgd ≤ Flow < 5 mgd | Tier 1 | $33,221 | $8,590 | $7,755 | $16,651 | $912 |
Ba | 5 mgd ≤ Flow < 10 mgd | Tier 1 | $33,221 | $12,775 | $11,939 | $16,651 | $912 |
A3 | 10 mgd ≤ Flow < 25 mgd | Tier 1 | $33,221 | $19,928 | N/A | $16,651 | $912 |
A2 | 25 mgd ≤ Flow < 50 mgd | Tier 1 | $33,221 | $42,282 | N/A | $16,651 | $912 |
A1 | ≥ 50 mgd | Tier 1 | $33,221 | $71,943 | N/A | $16,651 | $912 |
Septage alkaline stabilization facilities | F | N/A | Tier 2 | $912 | N/A | $374 | N/A | N/A | $414 |
Table 70C Domestic NPDES and WPCF Individual Permits |
Description | Type | Classification Criteria (Based on Average Dry Weather Design Flow, or as defined in 40CFR) | Class | New Permit App. Fee1 | Base Annual Fee, 5 year permits | Base Annual Fee, 10 year permits | Additional Annual Fees | Major Modification | Minor Modification |
Municipal Separate Storm Sewer System |
Phase 1 | See 40 CFR §122.26 | N/A | $18,449 | $4,153 | N/A | N/A | N/A | $1,603 |
Phase 2 | N/A | $826 | $850 | N/A | N/A | N/A | $1,603 |
Underground Injection Control | Various | As defined in 40 CFR parts 9, 144, 145 and 146 | N/A | $10,487 | N/A | $2,157 | N/A | N/A | $912 |
1. New permit applications must include the annual fee in addition to the new permit application fee.
Table 70D Domestic NPDES and WPCF Annual Population Fee |
Population range | Annual fee |
500,000+ | $96,654 |
400,000 to 499,999 | $73,941 |
300,000 to 399,999 | $51,227 |
200,000 to 299,999 | $28,512 |
150,000 to 199,999 | $23,060 |
100,000 to 149,999 | $15,188 |
50,000 to 99,999 | $9,526 |
25,000 to 49,999 | $4,281 |
15,000 to 24,999 | $2,437 |
10,000 to 14,999 | $1,588 |
5,000 to 9,999 | $966 |
1,000 to 4,999 | $289 |
100 to 999 | $54 |
0 to 99 | $0 |
Table 70E Annual Pretreatment Fees |
Description | Fee |
Pretreatment Fee | $1,657 |
Significant Industrial User | $553 per industry |
Table 70F Technical Activity and Other Fees |
Activity | Fee |
New or substantially modified sewage treatment facility | $7,623 |
Minor sewage treatment facility modifications and pump stations | $828 |
Pressure sewer system or major sewer collection system expansion | $581 |
Minor sewer collection system expansion or modification | $165 |
New or substantially modified water pollution control facilities using alkaline agents to stabilize septage | $828 |
Permit transfer | $82 |
Table 70G General NPDES and WPCF Permits |
Number | Type | Description | New Permit Application Fee1 | Annual Fee |
100-J | NPDES | Cooling water/heat pumps | $213 | $483 |
200-J | NPDES | Filter backwash | $213 | $483 |
300-J | NPDES | Fish hatcheries | $338 | $483 |
400-J | NPDES | Log ponds | $213 | $483 |
500-J | NPDES | Boiler blowdown | $213 | $483 |
600 | WPCF | Offstream small scale mining – processing less than five cubic yards of material per day, or less than 1,500 cubic yards per year | $0 | $0 |
Offstream small scale mining – processing 1,500 to10,000 cubic yards of material per year | $213 | $0 | ||
700-PM2 | NPDES | Suction dredges | $0 | $25 |
900-J | NPDES | Seafood processing | $213 | $483 |
1000 | WPCF | Gravel mining | $213 | $483 |
1200-A3 | NPDES | Stormwater: Sand, gravel, and other non-metallic mining | $826 | $850 |
1200-C3 | NPDES | Stormwater: Construction activities – one acre or more | $826 | $850 |
1200-C3 | NPDES | Stormwater: Construction activities – less than one acre and part of a common plan of development disturbing one or more acres | $243 | $0 |
1200-CA | NPDES | Stormwater: Construction activities performed by public agencies – one acre or more | $826 | $850 |
1200-COLS3 | NPDES | Stormwater: Industrial stormwater discharge to Columbia Slough | $826 | $850 |
1200-Z3,4 | NPDES | Stormwater: Industrial | $826 | $850 |
Table 70G General NPDES and WPCF Permits |
Number | Type | Description | New Permit Application Fee1 | Annual Fee |
1400-A | WPCF | Wineries and seasonal fresh pack operations whose wastewater flow does not exceed 25,000 gallons per day and is only disposed of by land irrigation. | $213 | $283 |
1400-B | WPCF | Wineries and small food processors not otherwise eligible for a 1400A general permit. | $338 | $483 |
1500-A | NPDES | Petroleum hydrocarbon clean-up | $338 | $483 |
1500-B | WPCF | Petroleum hydrocarbon clean-up | $338 | $483 |
1700-A | NPDES | Vehicle and equipment wash water | $471 | $483 |
1700-B | WPCF | Vehicle and equipment wash water | $471 | $483 |
1900-J | NPDES | Non-contact geothermal heat exchange | $471 | $483 |
2401 | WPCF | Tier 1 graywater reuse and disposal system for residential systems not exceeding 300 gallons per day, or equivalent specific geographic area graywater reuse and disposal area permit | $50 | $40 |
2402 | WPCF | Tier 2 graywater reuse and disposal system for systems not exceeding 1,200 gallons per day, or equivalent specific geographic area graywater reuse and disposal area permit | $534 | $50 |
Other | $471 | $483 |
1. New permit applications must include both the new permit application fee and the first year’s annual fee.
2. A person registered under the 700-PM permit may pre-pay $90 for permit coverage through 2014 in lieu of the $25 annual fee.
3. Some of these permits are administered by public agencies under contract with DEQ.
4. This permit incorporates the 1300-J permit.
Table 70H General Permit Activity and Other Fees |
Activity | Fee |
Disposal system plan review1 | $519 |
Site inspection and evaluation1 | $1,298 |
Permit Transfer | $82 |
1. These fees apply when these activities are required for DEQ’s review of the application.
340-071-0140
Onsite System Fees
(1) This rule establishes the fees for site evaluations, permits, reports, variances, licenses, and other services the department provides under this division.
(2) Site evaluation and existing system evaluation fees are listed in Table 9A. [Table not included. See ED. NOTE.]
(3) Permitting fees for systems not subject to WPCF permits are listed in Table 9B and Table 9C. [Table not included. See ED. NOTE.]
(4) WPCF permit fees. Fees in this section apply to WPCF permits issued pursuant to OAR 340-071-0162. WPCF permit fees are listed in Table 9D. [Table not included. See ED. NOTE.]
(5) Innovative or Alternative Technology or Material Review fees are listed in Table 9F. [Table not included. See ED. NOTE.]
(6) Material Plan Review fees are listed in Table 9F. [Table not included. See ED. NOTE.]
(7) Sewage Disposal Service License and Truck Inspection fees are listed in Table 9E. [Table not included. See ED. NOTE.]
(8) Contract county fee schedules.
(a) Each county having an agreement with the department under ORS 454.725 must adopt a fee schedule for services rendered and permits issued. The county fee schedule may not include the department's surcharge established in section (9) of this rule unless identified as a department surcharge.
(b) A copy of the fee schedule and any subsequent amendments to the schedule must be submitted to the department.
(c) Fees may not exceed actual costs for efficiently conducted services.
(9) Department surcharge.
(a) To offset a portion of the administrative and program oversight costs of the statewide onsite wastewater management program, the department and contract counties must levy a surcharge for each site evaluation, report permit, and other activity for which an application is required in this division. The surcharge fee is listed in Table 9F. [Table not included. See ED. NOTE.] This surcharge does not apply to sewage disposal service license applications, pumper truck inspections, annual report evaluation fees, or certification of installers or maintenance providers.
(b) Proceeds from surcharges collected by the department and contract counties must be accounted for separately. Each contract county must forward the proceeds to the department in accordance with its agreement with the department.
(10) Refunds. The department may refund all or a portion of a fee accompanying an application if the applicant withdraws the application before any field work or other substantial review of the application has been done.
[ED. NOTE: Tables referenced are not included in rule text. Click here for PDF copy of table(s).]
Stat. Auth.: ORS 454.625, 468.020 & 468.065(2)
Stats. Implemented: ORS 454.745, 468.065 & 468B.050
Hist.: DEQ 10-1981, f. & ef. 3-20-81; DEQ 19-1981, f. 7-23-81, ef. 7-27-81; DEQ 5-1982, f. & ef. 3-9-82; DEQ 8-1983, f. & ef. 5-25-83; DEQ 9-1984, f. & ef. 5-29-84; DEQ 13-1986, f. & ef. 6-18-86; DEQ 15-1986, f. & ef. 8-6-86; DEQ 6-1988, f. & cert. ef. 3-17-88; DEQ 11-1991, f. & cert. ef. 7-3-91; DEQ 18-1994, f. 7-28-94, cert. ef. 8-1-94; DEQ 27-1994, f. & cert. ef. 11-15-94; DEQ 12-1997, f. & cert. ef. 6-19-97; Administrative correction 1-28-98; DEQ 8-1998, f. & cert. ef. 6-5-98; DEQ 16-1999, f. & cert. ef. 12-29-99; Administrative correction 2-16-00; DEQ 9-2001(Temp), f. & cert. ef. 7-16-01 thru 12-28-01; DEQ 14-2001, f. & cert. ef. 12-26-01; DEQ 2-2002, f. & cert. ef. 2-12-02; DEQ 11-2004, f. 12-22-04, cert. ef. 3-1-05; DEQ 7-2008, f. 6-27-08, cert. ef. 7-1-08; DEQ 10-2009, f. 12-28-09, cert. ef. 1-4-10; DEQ 7-2010, f. 8-27-10, cert. ef. 9-1-10; DEQ 9-2011, f. & cert. ef. 6-30-11; DEQ 6-2012, f. f. 10-31-12, cert. ef. 11-1-12
OAR 340-071-0140
ONSITE SYSTEM FEE SCHEDULE
Table 9A
Site Evaluation and Existing System Evaluation Fees |
New Site Evaluation fees. Fees in this section apply to each system for which site suitability is evaluated. | |
Single family dwelling - First lot | $680 |
Single family dwelling - Each additional lot evaluated during initial visit | $680 |
Commercial facility with a design capacity of 1,000 gpd or less | $680 |
Commercial facility with a design capacity of 1,001-1,500 gpd | $856 |
Commercial facility with a design capacity of 1,501-2,000 gpd | $1,032 |
Commercial facility with a design capacity of 2,001-2,500 gpd | $1,208 |
Commercial facility with a design capacity of 2,501-3,000 gpd | $1,384 |
Commercial facility with a design capacity of 3,001-3,500 gpd | $1,560 |
Commercial facility with a design capacity of 3,501-4,000 gpd | $1,736 |
Commercial facility with a design capacity of 4,001-4,500 gpd | $1,912 |
Commercial facility with a design capacity of 4,501-5,000 gpd | $2,088 |
Commercial facility with a design flow greater than 5,000 gpd | $2,304 |
Site Evaluation Report Review fee | $640 |
Existing System Evaluation Report fee | $640 |
Table 9B
Permitting Fees for Systems Not Subject to WPCF Permits. Effective January 4, 2010 to January 2, 2011 |
Gray water waste disposal sumps |
Holding tanks | Standard subsurface, Absorption trenches in saprolite, Evapotranspiration- absorption, Redundant, Seepage trench, Steep slope | Alternative treatment technologies, Capping fill, Pressurized distribution, Tile dewatering |
Recirculating gravel filter, Sand filter (commercial or residential) |
Plan Review fees for commercial facility systems. |
Construction-Installation Permit fees. | |||||||
For systems with a design capacity of less than 600 gpd | $364 | $702 | $819 | $1,027 | $1,235 | $0 | |
For systems with a design capacity of 600 gpd but not more than 1,000 gpd |
$364 |
$702 |
$819 |
$1,027 |
$1,235 |
$299 | |
For systems with a design capacity of 1,001-1,500 gpd | $442 | $780 | $897 | $1,105 | $1,313 | $351 | |
For systems with a design capacity of 1,501-2,000 gpd | $520 | $858 | $975 | $1,183 | $1,391 | $403 | |
For systems with a design capacity of 2,001-2,500 gpd | $598 | $936 | $1,053 | $1,261 | $1,469 | $455 | |
Reinspection fee | $100 | ||||||
Pump Evaluation fee. For all permits that specify the use of a pump or dosing siphon except for sand filter, Alternative treatment technologies, Recirculating gravel filter, and pressurized distribution systems |
$52 |
Table 9B
Permitting fees for systems not subject to WPCF permits. Effective January 3, 2011 |
Gray water waste disposal sumps |
Holding tanks | Standard subsurface, Absorption trenches in saprolite, Evapotranspiration- absorption, Redundant, Seepage trench, Steep slope | Alternative treatment technologies, Capping fill, Pressurized distribution, Tile dewatering |
Recirculating gravel filter, Sand filter (commercial or residential) |
Plan Review fees for commercial facility systems. |
Construction-Installation Permit fees. | |||||||
For systems with a design capacity of less than 600 gpd | $448 | $864 | $1,008 | $1,235 | $1,520 | $0 | |
For systems with a design capacity of 600 gpd but not more than 1,000 gpd |
$448 |
$864 |
$1,008 |
$1,235 |
$1,520 |
$368 | |
For systems with a design capacity of 1,001-1,500 gpd | $544 | $960 | $1,104 | $1,313 | $1,660 | $432 | |
For systems with a design capacity of 1,501-2,000 gpd | $640 | $1,056 | $1,200 | $1,391 | $1,712 | $496 | |
For systems with a design capacity of 2,001-2,500 gpd | $736 | $1,152 | $1,296 | $1,469 | $1,808 | $560 | |
Reinspection fee | $100 | ||||||
Pump Evaluation fee. For all permits that specify the use of a pump or dosing siphon except for sand filter, Alternative treatment technologies, Recirculating gravel filter, and pressurized distribution systems |
$64 |
Table 9C
Other Permitting Fees for Systems Not Subject to WPCF permits. Effective January 4, 2010 to January 2, 2011 |
Field Visit required |
No Field Visit required | ||
Minor Alteration Permit | $215 | ||
Major Alteration Permit | $449 | ||
Minor Repair Permit - Single Family Dwelling | $215 | ||
Major Repair Permit - Single Family Dwelling | $449 | ||
Minor Repair Permit - Commercial Facility | $377 | ||
Major Repair Permit - Commercial Facility | $819 or the applicable fee in Table 9B, whichever is lower. | ||
Permit Denial Review | $352 | ||
Permit Transfer, Reinstatement, or Renewal | $423 | $124 | |
Authorization Notice | $507 | $130 | |
Authorization Notice Denial Review | $640 | ||
Renewal of hardship authorization for temporary dwelling | $330 | $100 | |
Alternative system inspection - Holding tanks | $312 | ||
Alternative system inspection - Other alternative systems listed in Table 9B |
$429 | ||
Annual report evaluation - Holding tanks | $25 | ||
Annual report evaluation - Commercial sand filters, recirculating gravel filters, and alternative treatment technology |
$50 | ||
Variance from onsite system rules | $2,080 |
Table 9C
Other Permitting Fees for Systems Not Subject to WPCF Permits. Effective January 3, 2011 |
Field Visit required |
No Field Visit required | ||
Minor Alteration Permit | $264 | ||
Major Alteration Permit | $552 | ||
Minor Repair Permit - Single Family Dwelling | $256 | ||
Major Repair Permit - Single Family Dwelling | $535 | ||
Minor Repair Permit - Commercial Facility | $464 | ||
Major Repair Permit - Commercial Facility | $1,008 or the applicable fee in Table 9B, whichever is lower. | ||
Permit Denial Review | $352 | ||
Permit Transfer, Reinstatement, or Renewal | $520 | $152 | |
Authorization Notice | $624 | $160 | |
Authorization Notice Denial Review | $640 | ||
Renewal of hardship authorization for temporary dwelling | $330 | $100 | |
Alternative system inspection - Holding tanks | $384 | ||
Alternative system inspection - Other alternative systems listed in Table 9B |
$528 | ||
Annual report evaluation - Holding tanks | $30 | ||
Annual report evaluation - Commercial sand filters, recirculating gravel filters, and alternative treatment technology |
$60 | ||
Variance from onsite system rules | $2,080 |
Table 9D
WPCF Permit Fees |
Application filing fee (all systems) | Permit processing fees for onsite systems with a design capacity of 1,200 gpd or less. |
Permit processing fees for onsite systems with a design capacity over 1,200 gpd: |
Plan Review fee. |
Annual Compliance Determination fee. |
New application
| $72 | $576 | $2,878 | |||
Permit renewal (involving request for effluent limit modifications) | $72 | $287 | $1,440 | |||
Permit renewal (without request for effluent limit modifications) | $72 | $145 | $718 | |||
Permit modification (involving increase in effluent limitations) | $72 | $287 | $1,440 | |||
Permit modification (not involving an increase in effluent limits) | $72 | $216 | $718 | |||
For commercial facilities with a design capacity less than 600 gpd | $0 | |||||
For commercial facilities with a design capacity of 600 - 1,000 gpd | $275 | |||||
For commercial facilities with a design capacity of 1,001 - 1,500 gpd | $324 | |||||
For commercial facilities with a design capacity of 1,501 - 2,000 gpd | $372 | |||||
For commercial facilities with a design capacity of 2,001 - 2,500 gpd | $420 | |||||
For commercial facilities with a design capacity of 2,501 - 3,000 gpd | $492 | |||||
For commercial facilities with a design capacity of 3,001 - 3,500 gpd | $540 | |||||
For commercial facilities with a design capacity of 3,501 - 4,000 gpd | $588 | |||||
For commercial facilities with a design capacity of 4,001 - 4,500 gpd | $635 | |||||
For commercial facilities with a design capacity of 4,501 - 5,000 gpd | $683 | |||||
Commercial facilities with a design capacity greater than 5,000 gpd | $718 | |||||
Single family dwelling | $145 | |||||
Onsite sewage lagoon with no discharge | $863 | |||||
Treatment Standard 1 or better systems with design capacities less than 2,500 gpd | $360 | |||||
Treatment Standard 1 or better systems with design capacities of 2,501 - 20,000 gpd | $718 | |||||
Holding tanks, if by the date specified by the department, the owner does not submit written certification to the department that the holding tank has been operated the previous calendar year in full compliance with the permit or that the previous year's service logs for the holding tanks are not available for inspection by the department |
$287 | |||||
Holding tanks, if by the date specified by the department, the owner submits written certification to the department that the holding tank has been operated the previous calendar year in full compliance with the permit and that the previous year's service logs for the holding tanks are available for inspection by the department.
|
$31 | |||||
Other systems with design capacities less than 20,000 gpd | $360 | |||||
Other systems with design capacities greater than 20,000 gpd | $718 | |||||
Site Evaluation Confirmation | $504
|
Table 9E
Sewage Disposal Service License and Truck Inspection Fees |
New 3-year business license | $355 per year |
Renewal of business license | $320 per year |
Transfer of or amendments to license | $200 |
Reinstatement of suspended license | $250 |
Pumper truck inspections - First vehicle, each inspection | $100 |
Pumper truck inspections - Each additional vehicle, each inspection | $50 |
Table 9F
Other Fees |
Innovative or Alternative Technology or Material Review | $1,600 |
Material Plan Review | $480 |
Department surcharge. | $60 |