Imbedded General Permit
1 MGD
1 ug/l
Sludge
Mass out
Process
0.2 MGD
Non-Process
0.8 MGD
0.2 MGD
1 ug/l
0.2 MGD
EL = < 5 ug/l
RPA here for Individual permit
• Intake Credit & WQBEL?
Types of General Permit Conditions: e.g.
• <5X increase in concentration (Avg.)
• > 30:1 dilution
• < 0.5, 1, 0.2 MGD depending on process type (single pass, multi-pass, electric, etc.)
• Sludge to SW, no backwash
General Permit
0.2 MGD
EL = < 5 ug/l
General Permit here w/deminimus
Non-Process
1 MGD
1 ug/l
Sludge
Mass out