DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION 216 OAR 340-216-0020
AIR CONTAMINANT DISCHARGE PERMITS Table 2 Part 1. Initial Permitting Application Fees: (in addition to first annual fee)
Part 2. Annual Fees: (Due 12/1 for 1/1 to 12/31 of the following year)
Part 3. Specific Activity Fees:
Part 4. Late Fees: a. 8-30 days late 5% of annual fee b. 31-60 days late 10% of annual fee c. 61 or more days late 20% of annual fee 1. Non-Technical modifications include, but are not limited to name changes, change of ownership and similar administrative changes. 2. Basic Technical Modifications include, but are not limited to corrections of emission factors in compliance methods, changing source test dates for extenuating circumstances, and similar changes. 3. Simple Technical Modifications include, but are not limited to, incorporating a PSEL compliance method from a review report into an ACDP, modifying a compliance method to use different emission factors or process parameter, changing source test dates for extenuating circumstances, changing reporting frequency, incorporating NSPS and NESHAP requirements that do not require judgment, and similar changes. 4. Moderate Technical Modifications include, but are not limited to incorporating a relatively simple new compliance method into a permit, adding a relatively simple compliance method or monitoring for an emission point or control device not previously addressed in a permit, revising monitoring and reporting requirements other than dates and frequency, adding a new applicable requirement into a permit due to a change in process or change in rules and that does not require judgment by the Department, incorporating NSPS and NESHAP requirements that do not require judgment, and similar changes. 5. Complex Technical Modifications include, but are not limited to incorporating a relatively complex new compliance method into a permit, adding a relatively complex compliance method or monitoring for an emission point or control devise not previously addressed in a permit, adding a relatively complex new applicable requirement into a permit due to a change in process or change in rules and that requires judgment by the Department, and similar changes. 6. This is a one time fee payable when a Compliance Order is established in a Permit or a Department Order containing a compliance schedule becomes a Final Order of the Department and is based on the number of months the Department will have to oversee the Order. |